All documents in Acrobat format. ![]()
Acknowledgement (51 K)
Executive Summary (109 K)
- Introduction
- Population
- Water Requirements
- Water Supply
- 4.1 Source of Supply
- 4.2 Hydraulic Capacity
- 4.3 Phasing of Supply Improvements
- 4.3.1 Phase I
- 4.3.2 Phase II
- 4.3.3 Phase III
- Water Treatment
- 5.1 Regulatory Evaluation of Existing Treatment Facilities
- 5.1.1 Disinfectants/Disinfection Byproducts
- 5.1.2 Cryptosporidium Inactivation/Removal
- 5.1.3 Arsenic
- 5.1.4 Atrazine and Daughter Products
- 5.2 Ozone System Improvements
- 5.2.1 Short-term Improvements
- 5.2.2 Long-term Improvement
- 5.3 Water Treatment Improvements
- 5.1 Regulatory Evaluation of Existing Treatment Facilities
- Distribution System
- 6.1 Existing Water Distribution System Facilities
- 6.2 Water Main Replacement Program
- 6.3 Transmission and Distribution Analysis
- 6.4 Vulnerability Analysis (Lincoln Supply)
- 6.5 Water Quality and Extended Period Simulation Analysis
- 6.5.1 Historical Distribution System Water Quality
- 6.5.2 Water Age Analyses
- 6.6 Recommended Water Distribution System Improvements
Acknowledgements
Black & Veatch gratefully acknowledges the cooperation and assistance of many people in the preparation of this report. The names of the people who participated in this study and who were instrumental in executing the project and in preparing the report are presented below.
| Name | Job Title |
|---|---|
| Lincoln Water System | |
| Jerry Obrist | Chief Engineer |
| Nick McElvain | Superintendent of Water Distribution |
| John Miriovsky | Superintendent of Treatment/Production |
| Clarence Owen | Asst. Supt. of Treatment/Production |
| Rick Roberts | Asst. Supt. of Maintenance |
| Dick Smith | Asst. Supt. of Operations |
| Eric Lee | Lab Supervisor |
| Paul Wimmer | Control System Specialist |
| Lonnie Rech | Asst. Supt. of Water Distribution |
| Leroy Meints | Asst. Supt. of Water Distribution |
| Executive Committee | |
| Allan Abbott | Public Works & Utilities - Director |
| Steve Masters | Public Utilities Administrator |
| Margaret Remmenga | Public Works & Utilities - Business Office Manager |
| Kathleen Sellmann | Director of Planning |
| Bob Renfrow | Black & Veatch - Facilities |
| Bruce Long | Black & Veatch - Treatment |
| Other City Departments | |
| Buff Baker | Public Works Engineering Services |
| Kent Morgan | Lincoln/Lancaster Planning |
| Steve Henrichsen | Lincoln/Lancaster Planning |
| Tracy Schuppan | CEIS |
| Black and Veatch | |
| Les Lampe | Vice President |
| Chad Hill | Project Manager |
| Andrew Hansen | Project Engineer |
| Jerry Edwards | Systems Planning Engineer |
| Jeff Henson | Hydrology Engineer |
| Holly Shorney | Process Engineer |
| Bob Hulsey | Process Engineer |
| Brian Lendt | GIS Technician |
| Pam Smith | Document Coordinator |
| Olsson Associates | |
| Kent Prior | Project Engineer |
| Rod Kirkland | Asst. Project Engineer |
| TZA Water Engineers, Inc. | |
| Bruce Kroeker | Principal |