Consultants currently under contract should coordinate with City's project manager to determine whether to conform to these new standards. All new contracts should use the most current available standards.
- MicroStation (11.2 M)
Includes the following:
Desktop Icons, Workspace, Interface, Project Configurations, Cells, Dataset, DGNLIB, Macros, MDLAPS, Plot Drivers, Section Manager, Seed Files, Font and Linestyle symbology files, Plot Pentables, VBA and Documentation
- GEOPAK (6.87 M)
Includes the following:
Desktop Icons, Criteria, D&C Manager, DTM - Preferences, Labeler, Standard Runs, Sheets Production, SMD, Horizontal and Superelevation Tables
- Project (2.5 M)
Includes the following:
Batch Command, Standard Directory Structure, Base Files, Sheet Files, Resource Files, Survey and Water Shed
- User (27 K)
Includes the following:
Batch Command, New User Profile
- Titleblock Manager (75 K)
-
Includes the following:
Standard Input File and Microsoft Excel Spreadsheet