* All documents in Adobe Acrobat (PDF) format. ![]()
Table of Contents
- 1.0 Introduction
- 2.0 Priority Corridors
- 3.0 City of Lincoln ITS Communication Network
- 3.1 Existing Signal Interconnect
- 3.2 Short-Term ITS Communication Needs
- 3.3 Long-Term ITS Communication Needs
- 4.0 ITS Communication Support and Coordination
- 4.1 High Level Communication Analysis
- 4.2 Communication Media
- 4.3 Data Transmission Technologies and Standards
- 4.4 Standards
- 4.5 Other Communication Infrastructure
- 4.6 ITS Communication Alternative Analysis
- 5.0 ITS User Needs
- 5.1 ITS Goals and Objectives
- 5.2 ITS User Services Identification Process
- 5.2.1 National ITS Architecture User Services
- 5.2.2 National ITS Architecture "Emerging" User Services
- 5.3 Selection of User Services
- 5.4 Mapping Transporation Goals and Objectives to Identified User Services
- 5.5 Assessment to Add or Modify User Services
- 6.0 Conclusion
- 6.1 ITS Communication System
- 6.2 ITS User Needs
Entire Report with tables (134 K) ![]()
Technical Appendices
- Appendix A: Minutes of Meeting with Local Communication Providers
- Appendix B: List of Attendees at ITS Workshops
For more information on the Technical Appendices, contact Scott Opfer, Project Manager, at 441-7711 or by email.
List of Tables
- Table 1: Existing City of Lincoln Signal Interconnect System
- Table 2: Bandwidth Requirement for the City of Lincoln ITS
- Table 3: Comparison of Various ITS Communication Media
- Table 4: Private Provider Cost Comparison
- Table 5: Identified ITS Goals and Objectives
- Table 6: User Service Bundles and User Services
- Table 7: "Emerging" User Services
- Table 8: ITS USer Services Used for Analysis in Lincoln, Nebraska
- Table 9: Preliminary Mapping of ITS Goals & Objectives to User Services
List of Figures
- Figure 1: Proposed Priority Corridors
- Figure 2: Existing Communication Network
- Figure 3: Short-Term (0-5 years) Communication Network
- Figure 4: Long-Term (6+ years) Communication Network
- Figure 5: Short-Term ITS Traffic Operations Communication System
- Figure 6: Long-Term (6+ years) ITS Traffic Operations Communication System
- Figure 7: Hub Allocation (Build-out) ITS Traffic Operations Communications System