Impact Fee Investments - Text Only

Arterial Streets

District 1
Design of 2 lane offset at W Adams from NW 63rd to NW 48th - $338,460
Design of 4 through lanes at Coddington from 'A' to Van Dorn - $378,010
Design of 4 through lanes at W 'A' to SW 40th and Coddington - $356,588
District 2
Design of 4 through lanes at 14th from Superior to Alvo - $839,769
Design of 2 lane offset at Fletcher from 14th to Telluride - $387,445
District 4
Design of 2 + 1 lane offset at 75th to 84th and Adams - $35,756
District 6
Design of 4 through lanes at 56th from Pine Lake to Yankee Hill - $265,261
Design of 4 through lanes at Pine Lake from 56th to Highway 2 - $432,166
Construction of 4 lane divided highway at 40th to 56th and Pine Lake - $770,556
District 7
Design of 4 through lanes at 27th from Pine Lake to Yankee Hill - $551,650
Total
$4,355,661

Parks and Trails

District 1
Sediment and erosion control measures at Ashley Heights Park - $2,517
District 2
Design of future Hartland Gardens Valley Park - $20,000
District 6
Design and construction of new trail at Cavett Connector - $25,439
Construction of Countryview Park Sidewalks - $8,984
Construction of Densmore Park Sidewalks - $3,922
Total
$60,862

Water/Wastewater

Water System

Pump Modifications at Northeast Pump Station - $1,271,031

Water Distribution

District 1
16" water main at NW 25th to 27th at Hwy. 34 $50,000
District 2
16" water main at NW 12th to 27th at Hwy. 34 - $17,728
30" and 24" water main at NW 12th to Fletcher at Hwy. 34 - $32,272
24" water main at Fletcher from 1st to 14th - $100,000
District 3
24" water main at N 56th from Fletcher to Arbor - $24,619
District 4
16" water main at Adams from 81st to 87th - $4,998
District 5
24" water main at 98th from Pine Lake to Yankee Hill - $74,683
District 6
30" water main at 27th to 56th, Yankee Hill to Union - $214,975
Total
$519,275

Wastewater

36" relief trunk sewer main at Beal Slough Basin - $550,000
West 'O' trunk sewer extension - $310,000
48" Upper Southeast trunk sewer main at Salt Valley Basin - $210,000
Total
$1,070,000