Main Menu Skip to Content
InterLinc Home Page
lincoln.ne.gov
City of Lincoln
Antelope Valley: Construction Information

Channel


Channel Construction Information

The second phase of the Antelope Creek flood control channel is currently under construction through a COE designed and administered contract. The second phase is scheduled to be completed in the fall of 2008. The third and final phase of the project has been bid and a contract is expected to be awarded in late July 2008. Construction of the final portion of the flood control channel is currently estimated to be complete at the end of 2009.

July 2008

Channel looking south from 'Y' to Vine
(25 K)
   

Phase II Construction Photos - Winter 2008

Channel looking north from Vine
(43 K)
Channel looking north from Vine
(33 K)
Channel looking north from Vine
(35 K)
Channel looking south from Vine
(46 K)
Channel looking south from Vine
(57 K)
Channel excavation south of Vine
(44 K)
Channel looking south from 'X' Street
(51 K)
Channel looking south from 'X' Street
(38 K)
Channel looking south from 'X' Street
(46 K)
  Channel looking south from 'X' Street
(49 K)
 

Phase II Construction Photos - Summer 2007

Channel Phase II, Between 'Y' and Vine
5/31/07 (93 K)
Channel Phase II, Looking North Between 'Y' and Vine
8/2/07 (57 K)
Channel Phase II, Near Vine Looking North
8/2/07 (37 K)

Image Archive

Validate

Construction Information