The second phase of the Antelope Creek flood control channel is currently under construction through a COE designed and administered contract. The second phase is scheduled to be completed in the fall of 2008. The third and final phase of the project has been bid and a contract is expected to be awarded in late July 2008. Construction of the final portion of the flood control channel is currently estimated to be complete at the end of 2009.
July 2008
Channel looking south from 'Y' to Vine(25 K) |
Phase II Construction Photos - Winter 2008
Phase II Construction Photos - Summer 2007
Channel Phase II, Between 'Y' and Vine5/31/07 (93 K) |
Channel Phase II, Looking North Between 'Y' and Vine8/2/07 (57 K) |
Channel Phase II, Near Vine Looking North8/2/07 (37 K) |