Main Menu Skip to Content
InterLinc Home Page
lincoln.ne.gov
City of Lincoln
Antelope Valley: Channel Construction Information

Phase II Construction Photos


Channel Phase II

Completed Construction

Channel between Vine and 'Y' Streets
(54 K)
Channel between Vine and 'Y' Streets
(52 K)
Channel and Bikeway under Vine Street Bridge
(51 K)
  Channel looking south from 'Y' to Vine
(25 K)
 

Winter 2008

Channel looking north from Vine
(43 K)
Channel looking north from Vine
(33 K)
Channel looking north from Vine
(35 K)
Channel looking south from Vine
(46 K)
Channel looking south from Vine
(57 K)
Channel excavation south of Vine
(44 K)
Channel looking south from 'X' Street
(51 K)
Channel looking south from 'X' Street
(38 K)
Channel looking south from 'X' Street
(46 K)
  Channel looking south from 'X' Street
(49 K)
 

Summer 2007

Channel Phase II, Between 'Y' and Vine
5/31/07 (93 K)
Channel Phase II, Looking North Between 'Y' and Vine
8/2/07 (57 K)
Channel Phase II, Near Vine Looking North
8/2/07 (37 K)
Validate

Channel Construction Information