Projects Under Construction

Detour Map Available Indicates detour map is available

14th from Fletcher to Alvo
Work is scheduled to begin in mid to late February. This project includes widening of 14th Street to two lanes in each direction, turn lanes, a two-lane roundabout at the intersection of 14th and Alvo, a bike trail on the west side of 14th from the I-80 bridge to Humphrey and sidewalks on the remaining portions of the project.
14th from Superior to I-80 Detour Map Available
This project consists of improving 14th Street from Superior Street to the I-80 bridge. The street will have two lanes in each direction with a center median. The intersections at 14th and Superior and 14th and Fletcher will also be improved. At 14th and Superior, a multi-lane roundabout will be put in place to increase efficiency and improve safety at the intersection. A traffic signal will be installed at the intersection of Fletcher Ave. and 14th Street.
Antelope Valley Parkway from 'K' to 'P'
This project is along the existing 19th Street alignment from 'K' to 'P' Streets and will reconstruct the roadway to a six-lane median-divided roadway including turn lanes. Also included is the reconstruction at the intersecting streets along the 19th Street corridor; 'L,' 'M,' 'N,' 'O,' and 'P' Streets.
Downtown Lincoln Street Resurfacing Project
Work is scheduled to begin in March. This project will mill and overlay approximately six miles of roadway surfacing on eleven streets in the Lincoln Central Business District. Also included is replacement of seven traffic signals.
South Street Bridge Reconstruction Detour Map Available
The project includes replacement of the existing South Street bridge over Antelope Creek, channel stabilization, water main relocation and sanitary sewer construction.

NDOR Projects

14th Street Bridge Over I-80 Acrobat Document Remote Site
Highway construction work is scheduled to begin, weather permitting, September 26, 2011 on the 14th Street bridge over I-80 at Lincoln. Work includes grading, culverts, bridge, and seeding.

2012 Construction Projects Acrobat Document

Map and summary of projects planned for construction in 2012.