56th from Old Cheney to Shadow Pines Dr.


Project Description

The City of Lincoln has selected E&A Consulting Group, Inc. to perform engineering services for design of the reconstruction of South 56th Street from Old Cheney Road to Shadow Pines Drive. The roadway will be designed as a 4-lane paved section with turn lanes and a raised median.

Project Highlights

If you have specific questions about this project or would like to see the design plans, please contact Kris Humphrey with the City of Lincoln Engineering Services at 402-441-7711.

Project Status

Design is scheduled to begin in January 2012, with a public information meeting to be held in spring of 2012. Construction is scheduled to begin in late-summer of 2013.

Project Contact

Kris Humphrey, City of Lincoln, Public Works & Utilities
Phone: 402-326-1176
Email: khumphrey@lincoln.ne.gov
Fred Beck, E&A Consulting Group, Inc.
Phone: 402-420-7217
Email: fbeck@eacg.com