N 14th from Superior to Alvo Rd. Remote Site
The overall goal of this project is to strengthen the North 14th Street Corridor while maintaining as little disruption as possible to those who live, work, and travel within this area.
S 14th and Warlick Remote Site
Information about the new design for the Old Cheney Road-Warlick Blvd.-14th Street intersection area to improve traffic operations and safety.
SW 40th Street Remote Site
The goals of this project are: to enhance the safety of the public and the railroad, to improve the operation of the area transportation system for its users by eliminating the delay at the BNSF rail crossing through construction of a grade separation over the railroad tracks, and to replace the deficient county bridge over Middle Creek.
Northwest 56th and West Adams Remote Site
Northwest Lincoln is a growth area for the community and roadway improvements to West Adams and NW 56th Streets are planned to accommodate future traffic demands in the area.
56th from Old Cheney to Pine Lake
Highlights include turn lanes, a new drainage structure, wetland detention cells, a pedestrian under-crossing and median construction
56th from Pine Lake to Yankee Hill
This project includes reconstruction of 56th Street from Thompson Creek Blvd. through Yankee Hill, and improvements at the intersection of Yankee Hill Road and 56th Street.
West 'A' from SW 40th to Coddington
This project will extend from SW 40th Street to Coddington Ave.
Adams from 75th to 87th Remote Site
The current two-lane rural roadway is planned to be a 3 lane roadway from 75th to 81st, transitioning to a 4 lane roadway with turn lanes to 87th Street. The design is also planned to include upgrading 84th Street from its current four-lane section to a six-lane roadway at the intersection.
East Beltway
The East Beltway will constitute the east leg of a circumferential freeway system around Lincoln that will be made up of Interstate 80 to the north, the Homestead Expressway (Hwy 77) to the west, and the South Beltway to the south.
South Beltway (NDOR) Remote Site
The South Beltway will be a new four-lane freeway across the southern suburban area of Lincoln and Lancaster County.
West Beltway (NDOR) Remote Site
The project involves upgrading existing US-77 to freeway standards from Saltillo Road, north to I-80.
S Coddington from W Van Dorn to W 'A' Remote Site
The design process for this project is about 60-percent complete. The project will resume when the City can obtain funding for right of way purchases and construction.
Pine Lake from 56th to Highway 2
The roadway will have 4 lanes with turn lanes, a raised median, sidewalks, curbs, and storm sewers.
Pine Lake Road - 84th to 98th Remote Site
The emphasis of the project is on three goals: safety of vehicular and pedestrian traffic, capacity of the roadway to accommodate future growth and improvement of traffic flow into and from the surrounding residential and commercial areas.
US Hwy. 6 / Sun Valley Boulevard Study Remote Site
Study of improvements for the U.S. Highway 6 / Sun Valley Boulevard corridor so that it can handle increased traffic projected for the future.
Van Dorn Safety Project Remote Site
The City of Lincoln, with support from the Nebraska Department of Roads, is modifying the intersections of 9th/Van Dorn Street and 10th/Van Dorn Street to address ongoing safety concerns.