Phase 2 commences with a connection to the Upper SE Salt Creek Sub-Basin Sewer-Phase 1 at approximately South 36th Street north of Rokeby Road and extends north and east along the existing drainage channel to a location south of 40th Street and Yankee Hill Road (see attached map - blue segment (378 K) Acrobat Document).

Final design and construction of the sewer has been coordinated with Lincoln Federal and their developer. Final design and construction of Phase 2 will be determined at a later date.

Project Summary

Project Information:
Phase 2 - 1,806 LF 18" Sewer, 740 LF 15" Sewer, 1,480 LF 12" Sewer
Opinion of Probable Construction Cost:
$798,000 (Based on 30% Design)

Project Schedule

Phase 2 Bid Date
To Be Determined
Phase 2 Construction Duration
To Be Determined

Contact Information

Lincoln Wastewater System:
Brian Kramer (402) 441-7987
City Project No. 502 458
Specification No. 04-313
HDR:
Terry McArthur (402) 742-2905
HDR Project No. 21257