Upper Southeast Salt Creek Sub-Basin Sewers - Phase II
Phase 2 commences with a connection to the Upper SE Salt Creek Sub-Basin Sewer-Phase 1 at approximately South 36th Street north of Rokeby Road and extends north and east along the existing drainage channel to a location south of 40th Street and Yankee Hill Road (see attached map - blue segment (378 K)
).
Final design and construction of the sewer has been coordinated with Lincoln Federal and their developer. Final design and construction of Phase 2 will be determined at a later date.
Project Summary
- Project Information:
- Phase 2 - 1,806 LF 18" Sewer, 740 LF 15" Sewer, 1,480 LF 12" Sewer
- Opinion of Probable Construction Cost:
- $798,000 (Based on 30% Design)
Project Schedule
- Phase 2 Bid Date
- To Be Determined
- Phase 2 Construction Duration
- To Be Determined
Contact Information
- Lincoln Wastewater System:
- Brian Kramer (402) 441-7987
- City Project No. 502 458
- Specification No. 04-313
- HDR:
- Terry McArthur (402) 742-2905
- HDR Project No. 21257
View Project Location Map (378 K) 
Acrobat (PDF) Version (232 K) ![]()