Beal Slough Relief Trunk Sewer Phase I


Connection to the west end of tunnel underneath the BNSF tracks Backfill operations at the connection of Salt Valley Trunk Sewer Phase IV and Beal Slough Dairy Hill initial soil removal - looking east toward 14th Street. Tunneling pit

Project Background

Construction of Phase I of the Beal Slough Relief Trunk Sewer project is underway. Phase I is the first phase of a multi-phased and multiyear project for providing additional capacity necessary to meet current and future growth in the Beal Slough basin. This relief trunk sewer adds 60-inch, 36-inch, and 30-inch diameter piping that runs parallel to an existing line.

Work Completed Through September 2006

Work Anticipated for October

Project Summary

Project Information:
  • 605 LF of 60-inch diameter sewer
  • 3,617 LF of 36-inch diameter sewer
  • 5,473 LF 30-inch diameter sewer
  • 550 LF of 27-inch diameter sewer
  • Roadway crossings at 14th Street, Southwood Drive, and 27th Street to be tunneled. No disruption to the traveling public.
Total Project Cost: $ 6,925,000 (Estimated)
Construction Contract Cost: $5,725,416.20
Funding: Sanitary Sewer Revenue Funds
Percentage of Project Completion: 5% (as of 9/15/06)

Project Schedule -- Current

Project Contacts

Construction Contractor
Garney Companies, Inc.
Mike Atkinson, (816) 746-7213
Lincoln Wastewater System
Brian Kramer
Supt. Wastewater Collection and Project Manager
bakramer@lincoln.ne.gov, (402) 441-7961
Olsson Associates (Consulting Engineer)
Holly Johnson
Project Engineer
hjohnson@oaconsulting.com, (402) 474-6311
Randy Moses
Construction Observer
rmoses@oaconsulting.com, (402) 474-6311

Background Information

Updated September 2006