Construction Update – April 2008
Deadmans Run Stream Bank Repair
Project No. 502009

Construction is nearing completion on a project to repair erosion on the west bank of Deadmans Run, just north of Cornhusker Highway, to protect the wastewater force main close to the bank. Work on the project began in February 2008.

The repairs are located just north of the current channel liner where the Creek crosses underneath Cornhusker Highway east of N. 27th Street.

Two wastewater outfall force main lines (24 inch & 36 inch diameter) from the N. 31st Wastewater Lift Station parallel the west bank of Deadmans Run.

The lift station serves the Little Salt wastewater basin that is generally located to the north and west of Salt Creek, and areas north toward Interstate 80. Bank erosion had progressed to within 8 to 10 feet of the nearest force main, and repair was necessary to prevent future erosion and protect the force main from possible failure.

Construction repairs include: soil excavation to remove and replace the eroded bank; repair of two storm drain outlets; installation of steel sheet piling and protective rock rip-rap surfacing to a new, more stable bank slope; final earthen sloping and seeding of the bank and areas disturbed by the construction.

Click for larger view
Installing Sheet Pile

Click for larger view
Rock Rip-rap Installation

Project Summary

General:
     Soil Embankment3820 CY (Cubic Yards)
     Rock Rip-rap4800 tons
     Sheet Piling600 LF (Lineal Feet)
Total Project Cost:$950,000 (Estimated)
Project Construction Cost:$809,550
Construction Status:98% (as of April 26, 2008)
Funding:Wastewater Utility Revenue Funds

Project Schedule

Start of ConstructionFebruary 11, 2008
Substantial CompletionApril 11, 2008
Final CompletionMay 15, 2008

Project Contacts

Land Construction Inc. (Construction Contractor)

  • Gary Varley – Superintendent
  • (402) 477-5263

HDR Engineering Inc.

  • Kent Prior – Project Manager
  • Kent.Prior@hdrinc.com
  • (402) 742-2906
  • Brent Peterson – Construction Observer
  • (402) 742-2900

Lincoln Wastewater System:

Site View – Deadmans Run Bank Repair

Erosion - West Bank of Deadmans Run Creek

West Bank - south location, looking south toward Cornhusker
West Bank - south location, looking south toward Cornhusker
West Bank - north location, looking south toward Cornhusker
West Bank - north location, looking south toward Cornhusker
CMP Storm Outlet  Pipe - between Home Depot & Shopko
CMP Storm Outlet Pipe - between Home Depot & Shopko

Installation of Steel Sheet Pile Along West Bank

Installing sheet pile
Installing sheet pile
Sheet pile and bank construction, looking south toward Cornhusker
Sheet pile and bank construction, looking south toward Cornhusker
Sheet pile and bank excavation at southern location
Sheet pile and bank excavation at southern location

Sheet Pile and Rock Rip-rap Bank Protection

Downstream termination of sheet pile and rock rip-rap
Downstream termination of sheet pile and rock rip-rap
Rock rip-rap installation on slope above sheet pile (southern location)
Rock rip-rap installation on slope above sheet pile (southern location)
Completed sheet pile and rip-rap before placement of upper sloped embankment
Completed sheet pile and rip-rap before placement of upper sloped embankment

Completed Slope With Mulch

May 2008 - Completed Slope With Mulch
May 2008 - Completed Slope With Mulch