Wastewater Projects

Theresa Street Wastewater Treatment Facility


City of Lincoln Logo HDR Logo

Theresa Street Wastewater Treatment Facility - Nitrification and Capacity Improvements Construction Project Update - November 2007
Project No. 502420

Construction continues on the advanced treatment process and capacity improvements to the Lincoln Wastewater System's Theresa St. Wastewater Treatment Facility. These improvements provide additional capacity for meeting future growth requirements and the City's continuing obligations to protect the public health and the environment.

For additional description and information of the improvements view the previous fact sheets:

Click for larger view
New Central Train Aeration Basin in operation.

Click for larger view
New Central Train Final Clarifier

The new central treatment train has been started up and met the demonstration period treatment performance requirements on October 12, 2007. On this same day, the central train was determined to be substantially complete and placed into full service.

At this time, the new central train and existing west side treatment train are treating the daily wastewater flows received at the treatment facility.

Remaining construction work includes: replacement of the existing final clarifier mechanisms for the east and west side process treatment trains; completion of roadway paving; final grading; and, sodding and seeding of disturbed site areas.

Project Summary: as of November 2007

Total Project Cost:
$24,830,000 (Estimated)
Project Construction Cost:
$18,510,000
Construction Status:
95% Complete (as of 8/31/07)
Funding:
Sanitary Sewer Revenue Funds

Project Schedule as of November 2007

Start of Construction
August 18, 2004
Substantial Completion
October 12, 2007 - Central Train
Final Completion
September, 2008 - Total Project

Project Contacts

Hawkins Construction (Construction Contractor):

HDR Engineering Inc.

  • Ron Sova - Project Manager
  • ron.sova@hdrinc.com
  • (402) 399-1335
  • Rob Mayer - Construction Observer
  • (402) 639-2965

Lincoln Wastewater System:

Background Information

Acrobat (PDF) Version of Project Update (383 K) Acrobat Document

Validate

Wastewater Projects