Project Description
The project consists of performing a Basin Study and Preliminary Design of wastewater collection system improvements in Upper Beal Slough drainage basin, and performing a Final Design of the main trunk sewer in Upper Beal Slough basin, from its existing point near 65th and Pine Lake Road, to 70th and Yankee Hill Road and east along the existing railroad tracks.
Funding and Benefits
Extending of the trunk line in Upper Beal Slough drainage basin provides for meeting future growth and development needs of the City in the Basin as outlined in the City's Comprehensive Plan. This project is included in the Capital Improvements Program and is funded by City of Lincoln Sanitary Sewer Revenue funds.
Project Details
- Anticipated Trunk Sewer for Final Design:
- 4600 LF 24" Sewer, 1200 LF 18" Sewer, 600 LF 12" Sewer
- Schedule:
- Preliminary Design: September 2005 to December 2005
- Final Design: December 2005 to February 2006
- Bid: March, 2006
- Construction: Spring 2006 (Expected to last 90 days)
- Lincoln Wastewater System
- Brian Kramer (402) 441-7987
- EA Engineering:
- Mark Bauer (402) 476-3766
Figures
- PDF Map of Project (273 K)