Construction Update – March 2008
Upper Beal Slough Sanitary Trunk Sewer Extension - Project No. 700924
Construction on the Upper Beal Slough Sanitary Trunk Sewer Extension project is underway. The project connects to an existing 27 inch diameter trunk near So. 60th & Pine Lake Road and then continues southeasterly to So. 70th St. and Yankee Hill Road. This line will provide service for future growth in the upper reaches of the Beal Slough Basin south of Pine Lake & Yankee Hill Roads and east and west of So. 70th St.
Current construction includes video television inspection, testing of manholes and piping, open trenching along 70th St. S. and through Yankee Hill Road, and restoring of top soil
Project Summary
| General: | |
|---|---|
| Trunk Sewer Pipe | 24 inch diameter – 5,350 LF 18 inch diameter - 790 LF |
| Tunneled Pipe Casing: | 36 inch diameter - 475 LF |
| Total Project Cost: | $1,600,000 (Estimated) |
| Project Construction Cost: | $1,018,710 |
| Construction Status: | 90% as of March 7, 2008 |
| Funding: | Sanitary Sewer Revenue Funds |
Project Schedule
| Start of Construction | October 29, 2007 |
|---|---|
| Substantial Completion | April, 2008 |
| Final Completion | May, 2008 |
Project Contacts
L.G. Roloff Construction Co. Inc. (Construction Contractor):
- Bob Norris – Project Manager
- (402) 861-1721
EA Engineering, Science, & Technology Inc.
- Dale Schlautman – Project Engineer
- dschlautman@eaest.com
- (402) 476-3766
Lincoln Wastewater System:
- Brian Kramer – Project Manager
- Supt. of Wastewater Collection
- bakramer@lincoln.ne.gov
- (402) 441-7987
- Mike Mandery – Construction Observer
- Senior Engineering Specialist
- mmandery @lincoln.ne.gov
- 402-441-7988