All documents in Acrobat (PDF) format ![]()
Download Complete Report (21.3 M Zip)
Volume I
- Cover Page (22 K)
- Table of Contents (32 K)
- Chapter 1 - Introduction (140 K)
- 1.1 Existing Conditions
- 1.1.1 Existing Collection System
- 1.1.2 Community Growth
- 1.2 Autorization for Work
- 1.3 Previous Planning
- 1.4 Public Involvement
- 1.4.1 Public Meetings
- 1.4.2 Newsletters and Fact Sheets
- 1.4.3 Web Site
- 1.4.4 City Contact
- Chapter 2 - Stevens Creek Basin (571 K)
- 2.1 General Location
- 2.2 Basin Areas
- 2.2.1 Main Basin
- 2.2.2 Subbasin Areas
- 2.2.3 Modified Subbasin Areas
- 2.3 Phased Implementation
- 2.3.1 General
- 2.3.2 West Side of Stevens Creek
- 2.3.3 East Side of Stevens Creek
- Chapter 3 - Preliminary Analysis (284 K)
- 3.1 General
- 3.2 Hydraulics
- 3.2.1 Peak flow
- 3.2.2 Manning's Equation
- 3.2.3 Pipe Size
- 3.2.4 Pipeline Velocity
- 3.2.5 Depth of Flow (d/D)
- 3.2.6 Structures
- 3.3 Hydraulic Modeling
- 3.3.1 Methodology
- 3.3.2 SewerCAD
- 3.3.3 XP SWMM
- 3.3.4 EXTRAN
- 3.3.5 Subbasin Flows
- 3.3.6 Trunk Sewer Modeling
- 3.3.7 Subbasin E-2 Sewer Model
- 3.4 Alternative Alignment Evaluation
- 3.4.1 Evaluation Criteria
- 3.4.2 Alternative Alignment Analysis
- Chapter 4 - Recommended Trunk Sewer (4.9 K)
- 4.1 Recommended Alignment
- 4.2 Hydraulic Modeling
- 4.3 Summary of Service Area
- 4.3.1 Recommended Trunk Sewer
- 4.3.2 Future Eastside Service (Tier III)
- 4.3.3 Regent Heights Sewer
- 4.4 Right of Way Requirements
- 4.4.1 Permanent Easement
- 4.4.2 Temporary Easement
- 4.5 Preliminary Design
- 4.5.1 Aerial Mapping
- 4.5.2 Plan and Profile Drawings
- 4.6 Probable Opinion of Estimated Costs
- 4.6.1 Methodology
- 4.6.2 Assumptions and Allowances
- 4.6.3 Probable Opinion of Estimated Costs
- 4.7 Implementation Plan
- 4.7.1 General
- 4.7.2 Base Plan
- 4.7.3 Accelerated Plan
- 4.8 Recommended Pipe Materials
- 4.9 Other Construction Issues
- 4.9.1 Highways, Roads, Streets, and Railroads
- 4.9.2 Farmland, Wetlands, and Grasslands
- 4.9.3 Stream Crossings
- Appendix A - Technical Memorandum No. 1 - Design Flow Equation (85 K)
- Appendix B - Technical Memorandum No. 2 - Structures (296 K)
- Appendix C - Technical Memorandum No. 3 - Hydraulics and Preliminary Modeling (2.1 M)
- Appendix D - Technical Memorandum No. 4 - Preliminary Alternative Alignments (4.86 M)
- Appendix E - Technical Memorandum No. 5. - Pipe Material Selection (202 K)
- Appendix F - Hydraulic Modeling Output for the Recommended Alignment (241 K)
- Appendix G - Probable Opinion of Estimated Costs for the Recommended Alignment (642 K)
List of Tables
- Table 2.1 Comparison of GIS Data to City Data
- Table 2.2 Subbasin Area
- Table 4.1 Summary of the Preferred Alignment
- Table 4.2 Probable Opinion of Estimated Project Costs
- Table 4.3 Tier I Implementation - Estimated Costs
- Table 4.4 Tier II Implementation - Estimated Costs
- Table 4.5 Accelerated Implementation
- Table 4.6 Summary of Recommended Pipe Materials
List of Figures
- Figure 1.1 Planning Tiers
- Figure 2.1 Stevens Creek Basin Watersheds and Stream Network
- Figure 2.2 Subbasins
- Figure 2.3 Subbasin Modifications
- Figure 3.1 Preferred Alignment
- Figure 4.1 Trunk Sewer Diagram
- Figure 4.2 Selected Alignment Pipe Profile
List of Drawings
- C-001 Alternative Alignment Analysis Phases I and II
- C-002 Alternative Alignment Analysis Phases II and III
- C-003 Alternative Alignment Analysis Phases III, IV, and V
- C-004 Alternative Alignment Analysis Phases V and VI
- C-005 Alternative Alignment Analysis Phases VI and VII
- C-006 Alternative Alignment Analysis Phases VII and VIII
- C-007 Alternative Alignment Analysis Phases VIII and IX
- C-008 Alternative Alignment Analysis Phase IX
- C-009 Alternative Alignment Analysis Phase IV