Wastewater Facilities
Master Plan Update
November 2007
Adopted 3-17-08
All documents in Acrobat (PDF) format ![]()
- Cover Page (154 K)
- Table of Contents (298 K)
- Chapter 1 - Executive Summary (6.56 M)
- 1.1 BACKGROUND
- 1.2 PLANNING GOALS AND OBJECTIVES
- 1.3 STUDY AREA BOUNDARIES
- 1.4 POPULATION PROJECTIONS
- 1.5 COLLECTION SYSTEM MODELING
- 1.6 COLLECTION SYSTEM IMPROVEMENTS
- 1.7 THERESA STREET WWTF IMPROVEMENTS
- 1.7.1 Projected Flows
- 1.7.2 Summary of Theresa Street WWTF Tier I and II Improvements
- 1.7.3 Summary of Theresa Street WWTF Tier III Improvements
- 1.8 NE WWTF IMPROVEMENTS
- 1.8.1 Summary of NE WWTF Tier I, II, and III Improvements
- 1.9 EMERGING WWTF TECHNOLOGIES AND OTHER CONSIDERATION
- 1.10 ADDITIONAL RECOMMENDATIONS
- 1.10.1 Collection System Operation and Maintenance
- 1.10.2 Peak Flow Reduction
- 1.10.3 Collection System Flow Monitoring Program
- 1.10.4 Hydraulic Modeling
- 1.10.5 Industrial Pre-Treatment Program
- 1.10.6 Wastewater Lift Stations
- 1.11 CIP - PLANNING LEVEL COSTS
- 1.11.1 Collection System
- 1.11.2 Wastewater Treatment Facilities
- 1.11.3 Combined Total Costs
- Chapter 2 - Introduction (119 K)
- 2.1 BACKGROUND
- 2.1.1 History
- 2.1.2 Reason for Updating the Wastewater Facilities Master Plan
- 2.1.3 2030 Comprehensive Plan
- 2.2 FACTORS THAT AFFECT FACILITIES PLANNING
- 2.2.1 Population Increases
- 2.2.2 Regulatory Changes
- 2.2.3 Condition and Age of Facilities
- 2.3 PLANNING GOALS AND OBJECTIVES
- 2.4 IDENTIFIED IMPROVEMENTS
- 2.5 RELATED STUDIES, REPORTS, AND DOCUMENTS
- 2.6 GENERAL TERMINOLOGY
- 2.6.1 Facilities
- 2.6.2 Wastewater Flow
- 2.6.3 Wastewater Constituents
- 2.7 WASTEWATER AND SOLID WASTE ORGANIZATION
- 2.8 ACKNOWLEDGMENTS
- Chapter 3 - Planning Considerations (3.91 M)
- 3.1 GENERAL
- 3.2 STUDY LIMITS
- 3.2.1 Geographical Boundaries
- 3.2.2 Wastewater Drainage Basins
- 3.2.3 Planning Areas
- 3.2.4 100 Year Floodplain Areas
- 3.3 PLANNING AGENCIES
- 3.4 EXISTING LAND USAGE
- 3.5 FUTURE LAND USE
- 3.6 POPULATION
- 3.6.1 Historical Population
- 3.6.2 Projected Population
- 3.6.3 Comparison of Land Inventory to Projected Population
- Chapter 4 - Existing Collection System (566 K)
- 4.1 BACKGROUND
- 4.1.1 Existing Collection System
- 4.1.2 Collection System Operation and Maintenance
- 4.2 WASTEWATER COLLECTION SYSTEM BASINS TRIBUTARY TO THE THERESA STREET WWTF
- 4.2.1 Salt Valley (Salt Creek)
- 4.2.2 Antelope Creek
- 4.2.3 West 'O' Street
- 4.2.4 Middle Creek
- 4.2.5 Haines Branch
- 4.2.6 Beal Slough
- 4.2.7 Oak Creek
- 4.2.8 Lynn Creek
- 4.2.9 Little Salt Creek
- 4.2.10 East Campus
- 4.3 WASTEWATER COLLECTION SYSTEM BASINS TRIBUTARY TO THE NORTHEAST WWTF
- 4.3.1 Deadmans Run
- 4.3.2 Havelock
- 4.3.3 Stevens Creek
- 4.4 WASTEWATER LIFT STATIONS
- 4.4.1 General Summary
- 4.4.2 Wastewater Lift Station Telemetry
- 4.4.3 Lift Station Operation and Maintenance
- Chapter 5 - Existing Wastewater Treatment Facilities (2.36 M)
- 5.1 THERESA STREET WWTF
- 5.1.1 Overview
- 5.1.2 Liquid Treatment
- 5.1.3 Biosolids Treatment
- 5.1.4 Odor Control
- 5.1.5 Recently Completed Improvements
- 5.1.6 Historical Influent Flows
- 5.1.7 Historical Influent Quality
- 5.1.8 Treatment Facility Performance
- 5.1.9 Discharge Permit
- 5.1.10 Future Capacity
- 5.2 NORTHEAST WWTF
- 5.2.1 Overview
- 5.2.2 Liquid Treatment
- 5.2.3 Odor Control
- 5.2.4 Biosolids Treatment
- 5.2.5 Recently Completed Improvements
- 5.2.6 Historical Influent Flows
- 5.2.7 Historical Influent Quality
- 5.2.8 Treatment Facility Performance
- 5.2.9 Discharge Permit
- 5.2.10 Future Capacity
- 5.3 COMPARISON OF WATER USAGE TO WASTEWATER FLOW
- 5.4 HISTORICAL PER CAPITA WASTEWATER FLOW
- 5.5 INDUSTRIAL CONTRIBUTIONS
- Chapter 6 - Regulatory Requirements (54 K)
- 6.1 CURRENT REGULATORY REQUIREMENTS
- 6.1.1 Surface Water Quality Standards
- 6.1.2 Effluent Discharge Permitting System
- 6.1.3 Residuals Disposal Regulations
- 6.1.4 Air Permits
- 6.1.5 Stormwater Permits
- 6.2 EVOLVING REGULATIONS
- 6.2.1 Effluent Limits
- 6.2.2 Biosolids Use and Disposal Regulations
- Chapter 7 - Basis for Alternative Evaluations (26 K)
- 7.1 GENERAL
- 7.2 ECONOMIC EVALUATION
- 7.2.1 Probable Opinion of Estimated Costs
- 7.2.2 Future Costs
- 7.2.3 Assigning Costs
- 7.2.4 Contingencies
- 7.2.5 Collection System Costs
- 7.2.6 Wastewater Treatment Facility Costs
- 7.2.7 Summary or Recommendation
- Chapter 8 - Development of the Collection System Hydraulic Model (76 K)
- 8.1 INTRODUCTION
- 8.2 DYNAMIC HYDRAULIC MODEL DEVELOPMENT
- 8.2.1 Data Collection
- 8.2.2 Establishment of Network Connectivity
- 8.3 HYDRAULIC MODEL FLOW INPUTS
- 8.3.1 Manning's Equation
- 8.3.2 Peak Flow Equation
- 8.3.3 Comparison of Peak Flow Equations
- 8.3.4 Flow Inputs
- 8.3.5 Development of Peak Flow Diurnal Curve
- 8.4 MODEL CALIBRATION
- 8.4.1 Wet Weather Flow Calibration
- Chapter 9 - Collection System Modeling Evaluation Criteria (26 K)
- 9.1 INTRODUCTION
- 9.2 DESIGN CRITERIA AND CONSTRAINTS
- 9.2.1 Existing and Future System Evaluation Criteria
- 9.2.2 Recommended Improvements Criteria
- 9.3 MODEL SCENARIOS
- Chapter 10 - Salt Creek Basin (1.03 M)
- 10.1 SALT VALLEY TRUNK SEWER SYSTEM
- 10.2 EXISTING CONDITIONS
- 10.2.1 Model Results
- 10.2.2 Improvements
- 10.3 TIER I CONDITIONS
- 10.3.1 Modeling Results
- 10.3.2 Identification of Alternatives
- 10.4 TIER II CONDITIONS
- 10.4.1 Modeling Results
- 10.4.2 Improvements/Recommendations
- 10.5 TIER III CONDITIONS
- 10.5.1 Model Results
- 10.5.2 Improvements
- 10.6 SUMMARY OF RECOMMENDED IMPROVEMENTS
- Chapter 11 - Antelope Creek Basin (721 K)
- 11.1 ANTELOPE CREEK TRUNK SEWER SYSTEM
- 11.2 EXISTING CONDITIONS
- 11.2.1 Model Results
- 11.2.2 Improvement Alternatives
- 11.3 TIER I CONDITIONS
- 11.3.1 Model Results
- 11.3.2 Identified Alternatives
- 11.4 SUMMARY OF RECOMMENDED IMPROVEMENTS
- Chapter 12 - Beal Slough Basin (483 K)
- 12.1 BEAL SLOUGH TRUNK SEWER SYSTEM
- 12.2 EXISTING CONDITIONS
- 12.2.1 Model Results
- 12.2.2 Improvements
- 12.3 TIER I CONDITIONS
- 12.3.1 Model Results
- 12.3.2 Alternative Identification
- 12.4 SUMMARY OF RECOMMENDED IMPROVEMENTS
- Chapter 13 - Upper Southeast Salt Creek Basin (371 K)
- 13.1 UPPER SOUTHEAST TRUNK SEWER SYSTEM
- 13.2 MODELING RESULTS
- 13.2.1 Tier I Conditions
- 13.2.2 Tier II Conditions
- 13.3 IMPROVEMENTS
- 13.3.1 Tier I Improvements
- 13.3.2 Tier II Improvements
- 13.4 SUMMARY OF RECOMMENDED IMPROVEMENTS
- Related Links: Upper Southeast Salt Creek Alignment Study
- Chapter 14 - Upper Southwest Salt Creek Basin (517 K)
- 14.1 UPPER SOUTHWEST TRUNK SEWER SYSTEM
- 14.2 MODELING RESULTS
- 14.2.1 Tier I Conditions
- 14.2.2 Tier II Conditions
- 14.2.3 Tier III Conditions
- 14.3 IMPROVEMENTS
- 14.3.1 Tier I Improvements
- 14.3.2 Tier II Improvements
- 14.3.3 Tier III Improvements
- 14.4 SUMMARY OF RECOMMENDED IMPROVEMENTS
- Chapter 15 - Haines Branch Basin (389 K)
- 15.1 HAINES BRANCH TRUNK SEWER SYSTEM
- 15.2 MODELING RESULTS
- 15.2.1 Existing Conditions
- 15.2.2 Tier I Conditions
- 15.2.3 Tier II Conditions
- 15.2.4 Tier III Conditions
- 15.3 IMPROVEMENTS
- 15.3.1 Tier I Improvements
- 15.3.2 Tier II Improvements
- 15.3.3 Tier III Improvements
- 15.4 SUMMARY OF RECOMMENDED IMPROVEMENTS
- Chapter 16 - Middle Creek and West 'O' Street Basins (1.11 M)
- 16.1 MIDDLE CREEK AND WEST 'O' STREET TRUNK SEWER SYSTEMS
- 16.2 MODELING RESULTS
- 16.2.1 Existing Conditions
- 16.2.2 Tier I Conditions
- 16.2.3 Tier II Conditions
- 16.2.4 Tier III Conditions
- 16.3 IMPROVEMENTS
- 16.3.1 Existing Conditions
- 16.3.2 Tier I Improvements
- 16.3.3 Tier II Improvements
- 16.3.4 Tier III Improvements
- 16.4 SUMMARY OF RECOMMENDED IMPROVEMENTS
- Chapter 17 - Oak Creek and Lynn Creek Basins (1.57 M)
- 17.1 TRUNK SEWER SYSTEM
- 17.2 MODELING RESULTS
- 17.2.1 Existing Conditions
- 17.2.2 TIER I CONDITIONS
- 17.2.3 Tier II Conditions
- 17.2.4 Tier III Conditions
- 17.3 IMPROVEMENTS
- 17.3.1 Existing Improvements
- 17.3.2 Tier I Improvements
- 17.3.3 Tier II Improvements
- 17.3.4 Tier III Improvements
- 17.4 SUMMARY OF RECOMMENDED IMPROVEMENTS
- Related Links: Oak Creek Basin Trunk Sewer and Sub-Basin Sewers Preliminary Design Report
- Chapter 18 - Little Salt Creek Basin (1.19 M)
- 18.1 LITTLE SALT CREEK TRUNK SEWER SYSTEM
- 18.2 MODELING RESULTS
- 18.2.1 Existing Conditions
- 18.2.2 Tier I Conditions
- 18.2.3 Tier II Conditions
- 18.2.4 Tier III Conditions
- 18.3 IMPROVEMENTS
- 18.3.1 Existing Conditions
- 18.3.2 Tier I Improvements
- 18.3.3 Tier II Improvements
- 18.3.4 Tier III Improvements
- 18.4 SUMMARY OF RECOMMENDED IMPROVEMENTS
- Chapter 19 - Deadmans Run, East Campus, and Havelock Basins (863 K)
- 19.1 TRUNK SEWER SYSTEMS
- 19.2 MODELING RESULTS
- 19.2.1 Existing Conditions
- 19.2.2 Tier I Conditions
- 19.3 IMPROVEMENTS
- 19.3.1 Existing Conditions
- 19.3.2 Tier I Conditions
- 19.4 SUMMARY OF RECOMMENDED IMPROVEMENTS
- 19.4.1 Sewer Monitoring
- 19.4.2 84th Street Sewer
- Chapter 20 - Northeast Salt Creek Basin (1 M)
- 20.1 NORTHEAST SALT CREEK TRUNK SEWER SYSTEM
- 20.1.1 Modeling Results
- 20.1.2 Existing Conditions
- 20.1.3 Tier I Conditions
- 20.1.4 Tier II and III Conditions
- 20.2 IMPROVEMENTS
- 20.2.1 Tier 1
- 20.2.2 Tier II
- 20.2.3 Tier III
- 20.3 SUMMARY OF RECOMMENDED IMPROVEMENTS
- Related Links: Northeast Salt Creek Collection System Study
- Chapter 21 - Stevens Creek Basin (1.21 M)
- 21.1 STEVENS CREEK TRUNK SEWER SYSTEM
- 21.2 MODELING RESULTS
- 21.2.1 Existing Conditions
- 21.2.2 Tier I Conditions
- 21.2.3 Tier II Conditions
- 21.2.4 Tier III Conditions
- 21.3 IMPROVEMENTS
- 21.3.1 Tier I Improvements
- 21.3.2 Tier II Improvements
- 21.3.3 Tier III Improvements
- 21.4 SUMMARY OF RECOMMENDED IMPROVEMENTS
- Related Links: Stevens Creek Trunk Sewer Preliminary Design Report
- Chapter 22 - Southeast Basin (554 K)
- 22.1 SOUTHEAST DRAINAGE BASIN
- 22.2 MODELING RESULTS
- 22.2.1 Existing, Tier I and Tier II Conditions
- 22.2.2 Tier III
- 22.3 TIER III IMPROVEMENTS
- Chapter 23 - Collection System Summary (3 M)
- 23.1 SUMMARY OF IMPROVEMENTS
- 23.2 LIFT STATION IMPROVEMENTS
- 23.2.1 Summary
- 23.2.2 Recommended Improvements to Existing Lift Stations
- 23.2.3 Anticipated New Lift Stations
- 23.3 SUMMARY OF COLLECTION SYSTEM MODELING
- 23.3.1 Theresa Street WWTF Drainage Areas
- 23.3.2 NE WWTF Drainage Areas
- Chapter 24 - Wastewater Treatment Facilities Future Improvements (7.21 M)
- 24.1 INTRODUCTION
- 24.2 THERESA STREET WWTF - FUTURE IMPROVEMENTS
- 24.2.1 Current Through Tier II Improvements
- 24.2.2 Recent and Current Improvements
- 24.2.3 Tier I Improvements - Current and Recommended
- 24.2.4 Tier II Improvements
- 24.2.5 Tier III Improvements
- 24.2.6 Summary of Tier III Improvements
- 24.2.7 Summary of Theresa Street WWTF Improvements
- 24.3 NORTHEAST STREET WWTF
- 24.3.1 Overview
- 24.3.2 Tier I Improvements
- 24.3.3 Tier II Improvements
- 24.3.4 Tier III Improvements
- 24.3.5 Summary of NE WWTF Improvements
- 24.4 EMERGING WASTEWATER TREATMENT TECHNOLOGIES AND OTHER CONSIDERATIONS
- 24.5 SUMMARY OF IDENTIFIED WWTF IMPROVEMENTS
- Chapter 25 - Additional Recommendations (459 K)
- 25.1 GENERAL
- 25.2 COLLECTION SYSTEM OPERATION AND MAINTENANCE
- 25.3 PEAK FLOW REDUCTION
- 25.3.1 I/I Flow Reduction
- 25.3.2 Foundation Drains - Sump Pumps
- 25.3.3 Service Lateral Repairs
- 25.3.4 Low Flow Plumbing Devices
- 25.4 COLLECTION SYSTEM FLOW MONITORING PROGRAM
- 25.4.1 Components of Wastewater Flows
- 25.4.2 Need for Flow Monitoring Program
- 25.5 INDUSTRIAL PRE-TREATMENT PROGRAM
- Chapter 26 - Summary of Planning Costs and Phasing (71 K)
- 26.1 GENERAL
- 26.2 SUMMARY OF ESTIMATED IMPROVEMENT COSTS
- 26.2.1 Collection System
- 26.2.2 Wastewater Treatment Facilities
- 26.3 OVERVIEW
- Appendices
- Appendix A History of Wastewater Collection and Treatment in Lincoln (364 K)
- Appendix B Abbreviations (25 K)
- Appendix C Wastewater Lift Stations (713 K)
- Appendix D Hydraulic Model Results (868 K)
- Appendix E WWTF Process and Equipment Identification (439 K)
- Appendix F Theresa Street and Northeast WWTF's Discharge Permits (4.31 M)
- Appendix G Industrial Audit (FY 2005/2006) (1.64 M)
- Appendix H Air Permit for Theresa Street WWTF (3.49 M)
- Appendix I Stormwater Permits for Both WWTF's (169 K)
- Appendix J Biosolids Agreement and 2006 Reports (1.19 M)
- Appendix K NE WWTF Biosolids Land Application Yearly Summaries (1996-2006) (601 K)
- Appendix L Theresa Street WWTF Odor Abatement Study (904 K)
- Appendix M Theresa Street WWTF Hydraulic Profile Calculations (2.52 M)
- Appendix N Southwest Wastewater Facility Siting Study Report -Removed based on City Council and County Board actions.
- List of Tables
- Table 1.1 Population Projections from 2005 to 2060 (1)
- Table 1.2 Modeled Theresa Street WWTF Drainage Areas (1,2)
- Table 1.3 Modeled NE WWTF Drainage Areas (1,2)
- Table 1.4 Summary of Collection System Pipeline Improvements (1)
- Table 1.5 Summary of Collection System Storage Improvements (1)
- Table 1.6 Summary of Tier III Planning Level Costs
- Table 1.7 Summary of Collection System Improvement Costs (1)
- Table 1.8 Summary of Wastewater Treatment Facility Improvement Costs (1,2)
- Table 1.9 Total of Collection and WWTF Improvements Costs (1,2)
- Table 3.1 Historical Population From 1880 to 1980 (1)
- Table 3.2 Population Projections from 2005 to 2060 (1)
- Table 3.3 Acreage Calculations Based on Population
- Table 4.1 Historical Length of Sanitary Sewer Pipe Installed
- Table 4.2 Increase in Existing Wastewater Drainage Basin Areas
- Table 4.3 Existing Collection System Operations and Maintenance Requirements
- Table 4.4 Summary of Wastewater Lift Stations
- Table 5.1 Rated Capacity of the Theresa Street WWTF
- Table 5.2 Theresa Street WWTF Secondary Treatment Summary
- Table 5.3 Theresa Street WWTF Annual Biosolids Land Application Volumes
- Table 5.4 Theresa Street WWTF Historical Influent Flows
- Table 5.5 Theresa Street WWTF Average Influent Loading Concentrations
- Table 5.6 Theresa Street WWTF Average Influent Mass Loading
- Table 5.7 Theresa Street WWTF Average Effluent Concentrations
- Table 5.8 Theresa Street WWTF Average Influent Removal (1)
- Table 5.9 Theresa Street WWTF Effluent Fecal Coliform Concentrations (1)
- Table 5.10 Rated Capacity of the Northeast WWTF
- Table 5.11 Northeast WWTF Secondary Treatment Summary
- Table 5.12 Northeast WWTF Annual Average Flows
- Table 5.13 Northeast WWTF Average Influent Loading Concentrations
- Table 5.14 Northeast WWTF Average Influent Mass Loading
- Table 5.15 Northeast WWTF Average Effluent Concentrations
- Table 5.16 Northeast WWTF Average Influent Removal (1)
- Table 5.17 Northeast WWTF Effluent Fecal Coliform Concentrations (1)
- Table 5.18 Comparison of Water Usage and Wastewater Treatment Facility Flows
- Table 5.20 Industrial Flow and Loading Contributions
- Table 6.1 Salt Creek Segment LP2-20000 Stream Classification
- Table 6.2 Theresa Street WWTF NPDES Permit Monitoring Requirements
- Table 6.3 Theresa Street WWTF Effluent NPDES Permit Limitations
- Table 6.4 Northeast WWTF Effluent NPDES Permit Limitations
- Table 6.5 Theresa Street WWTF - Air Permit Requirements (1)
- Table 7.1 Collection System Planning Costs
- Table 7.2 Wastewater Treatment Facility Planning Costs
- Table 8.1 Key Hydraulic Model Data
- Table 8.2 Collection System Lift Stations included in the Hydraulic Model
- Table 8.3 Peak Wastewater Design Flow Equation Comparison
- Table 8.3 Wet Weather Calibration Results
- Table 9.1 Existing System Model Scenarios
- Table 10.1 Salt Valley Trunk Sewer System Existing and Future Tributary Areas
- Table 10.2 Surcharged Pipes Salt Valley System - Tier I Conditions
- Table 10.3 Results of Flow Maximization of Existing System
- Table 10.4 Simulation Results of Storage with Flow Maximization
- Table 10.5 Comparison of d/D Ratios for various I/I Flow Reduction Target Levels
- Table 10.6 Manholes with Modeled SSO's Under Tier II Conditions
- Table 10.7A Surcharged Pipes Salt Valley System - Tier II Conditions
- Table 10.7B Surcharged Pipes Salt Valley System - Tier II Conditions
- Table 10.7C Surcharged Pipes Salt Valley System - Tier II Conditions
- Table 10.8 Recommended Improvements - Salt Valley Trunk Sewer System
- Table 11.1 Antelope Creek Trunk Sewer System Modeling Areas (ac) (1,2)
- Table 11.2 Surcharged Pipes - Existing Conditions - Antelope Creek Trunk Sewer
- Table 11.3 Surcharged Pipes - Tier I Conditions - Antelope Creek Trunk Sewer
- Table 11.4 Recommended Improvements - Antelope Creek Trunk Sewer
- Table 12.1 Beal Slough Trunk Sewer Tributary Areas (ac) (1,2)
- Table 12.2 Surcharged Pipes - Tier I Conditions
- Table 12.3 Recommended Improvements - Beal Slough Trunk Sewer System
- Table 13.1 Service Area and Flows - Upper Southeast Basin (1,2)
- Table 13.2 Upper Southeast Basin Tier I Modeling Results
- Table 13.3 Design Characteristics of Proposed Sewers - Upper SE Basin
- Table 13.4 Modeling Results of Proposed Sewers - Upper Southeast Basin
- Table 13.5 Recommended Improvements - Upper Southeast Basin
- Table 14.1 Service Areas and Flows - Upper Southwest Basin
- Table 14.2 Design Characteristics of Proposed Sewers - Upper SW Basin
- Table 14.3 Modeling Results of Proposed Sewers - Upper Southwest Basin
- Table 14.7 Recommended Improvements - Upper Southwest Salt Valley Basin
- Table 14.7 Recommended Improvements - Upper Southwest Salt Valley Basin
- Table 15.1 Service Areas and Flows - Haines Branch Basin (1,2)
- Table 15.2 Design Characteristics of Proposed Sewers - Haines Branch Basin
- Table 15.3 Modeling Results of Proposed Sewers - Haines Branch Basin
- Table 15.4 Recommended Improvements - Haines Branch Basin
- Table 15.4 Recommended Improvements - Haines Branch Basin
- Table 16.1 Service Areas and Flows - West O St & Middle Creek Basins
- Table 16.2 Manholes with Modeled SSO's - Tier I Conditions - West 'O' St and Middle Creek Basins
- Table 16.3 Design Characteristics of Proposed Sewers - Middle Creek Basin
- Table 16.4 Design Characteristics of Proposed Sewers - West O St Basin
- Table 16.5 Modeling Results of Proposed Sewers - Middle Creek Basin
- Table 16.6 Modeling Results of Proposed Sewers - West O St Basin
- Table 16.7 Recommended Improvements - West 'O' Street and Middle Creek Basins
- Table 16.7 Recommended Improvements - West 'O' Street and Middle Creek Basins
- Table 16.7 Recommended Improvements - West 'O' Street and Middle Creek Basins
- Table 17.1 Service Areas and Flows - Oak Creek and Lynn Creek Basins
- Table 17.2 Oak Creek Manholes with Modeled SSO's - Existing Conditions
- Table 17.3 Surcharged Pipes - Oak Creek Basin - Existing Conditions
- Table 17.4 Surcharged Pipes - Lynn Creek Basin - Existing Conditions
- Table 17.5 Design Characteristics of Proposed Sewers - Oak Creek Basin
- Table 17.6 Modeling Results of Proposed Sewers - Oak Creek Basin
- Table 17.7 Recommended Improvements - Oak Creek and Lynn Creek Basins
- Table 17.7 Recommended Improvements - Oak and Lynn Creek Basins
- Table 17.7 Recommended Improvements - Oak and Lynn Creek Basins
- Table 18.1 Service Areas and Flows - Little Salt Creek Basin (1,2)
- Table 18.2 Design Characteristics of Proposed Sewers - Little Salt Basin
- Table 18.3 Modeling Results of Proposed Sewers - Little Salt Basin
- Table 18.4 Recommended Improvements – Little Salt Creek Basin
- Table 19.1 Service Area and Flows - Deadmans Run, East Campus, & Havelock Basins (1,2)
- Table 19.2 Surcharged Pipes - Existing Conditions- Deadmans Run Basin
- Table 19.3 Comparison of d/D Ratios for I/I Flow Reduction Target Levels - Deadmans Run Basin
- Table 20.1 Service Areas and Flows - Northeast Salt Creek Basin (1,2)
- Table 20.2 Un-Developable Areas in Northeast Salt Creek Basin
- Table 20.3 Northeast Salt Creek Tier I Phased Basin Development Plan
- Table 20.5 Design Characteristics of Proposed Sewers - Northeast Salt Creek Basin
- Table 20.6 Modeling Results of Proposed Sewers - Northeast Salt Creek Basin
- Table 20.7 Recommended Improvements – Northeast Salt Creek Basin
- Table 20.7 Recommended Improvements – Northeast Salt Creek Basin
- Table 21.1 Service Areas and Flows - Stevens Creek Basin (1,2)
- Table 21.2 Design Characteristics of Proposed Sewers - Stevens Creek Basin
- Table 21.3 Modeling Results of Proposed Sewers - Stevens Creek Basin
- Table 21.4 Recommended Improvements – Stevens Creek Basin
- Table 22.1 Service Areas and Flows - Southeast Basin (1,2)
- Table 22.2 Design Characteristics of Proposed Sewers - Southeast Basin
- Table 22.3 Modeling Results of Proposed Sewers - Southeast Basin
- Table 22.4 Recommended Improvements – Southeast Basin
- Table 23.1 Summary of Collection System Pipeline Improvements (1)
- Table 23.2 Summary of Collection System Storage Improvements (1)
- Table 23.3 Modeled Theresa Street WWTF Drainage Areas (1,2)
- Table 23.4 Modeled NE WWTF Drainage Areas (1,2)
- Table 24.1 Modeled Tier III Theresa Street and SW WWTF Drainage Areas (1,2)
- Table 24.2 New SW WWTF - Tier III Alternative 1
- Table 24.3 New West Side Salt Creek Trunk Sewer - Tier III Alternative 2
- Table 24.4 Parallel East Side Salt Creek Trunk Sewer - Tier III Alternative 3
- Table 24.5 Increased Storage - Tier III Alternative 4
- Table 24.6 Summary of Tier III Planning Level Costs
- Table 24.7 Recommended Improvements – Theresa Street Wastewater Treatment Facility
- Table 24.8 Recommended Improvements – Northeast Wastewater Treatment Facility
- Table 25.1 Collection System Projected Cleaning and Videoing Crew Needs
- Table 26.1 Summary of Collection System Improvement Costs (1)
- Table 26.2 Summary of Wastewater Treatment Facility Improvement Costs (1,2)
- Table 26.3 Comparison of City CIP and Master Plan Update Costs for Tier I Period (1,2)
- List of Figures
- Figure 1.1 - Study Area Boundaries
- Figure 1.2 - Modeled Peak Collection System Flows at Theresa Street WWTF
- Figure 1.3 Modeled Peak Collection System Flows at NE WWTF
- Figure 1.4 Planning Area Tier I Improvements
- Figure 1.5 Planning Area Tier II Improvements
- Figure 1.6 Planning Area tier III Improvements
- Figure 1.7 Planning Area Storage Improvements
- Figure 1.8 Schematic Drawing of Storage Facilities
- Figure 1.9 General Layout of Storage Facilities
- Figure 1.10 Theresa Street WWTF Projected MMAD Flows
- Figure 1.11 Theresa Street WWTF Aerial Photo with Tier I and II Future Improvements
- Figure 1.12 Northeast WWTF Projected MMAD Flows
- Figure 1.13 Northeast WWTF Future Improvements
- Figure 1.14 General Layout of WWTF Site
- Figure 1.15 Annual Cost of Collection System Improvements
- Figure 1.16 Annual Cost of Theresa Street and Northeast WWTF Improvements
- Figure 1.17 Summary of Annual Cost of Improvements
- Figure 2.1 City of Lincoln Wastewater and Solid Waste System Organization Chart
- Figure 3.1 Project Study Area
- Figure 3.2 Drainage Basins
- Figure 3.3 Utility Planning Zones
- Figure 3.4 Planning Growth Tiers
- Figure 3.5 100 Year Floodplain
- Figure 3.6 Historical and Projected Population Trends for City of Lincoln and Lancaster County
- Figure 3.7 Comparison of Historic and Projected Population to Projected Tier Growth
- Figure 4.1 Existing Wastewater Trunk Sewer System
- Figure 4.2 Historical Collection System Stoppages
- Figure 5.1 Theresa Street WWTF Liquid Process Schematic
- Figure 5.2A Theresa Street WWTF Hydraulic Profile - Central Train
- Figure 5.2B Theresa Street WWTF Hydraulic Profile - East and West Train
- Figure 5.3 Theresa Street WWTF Solids Process Schematic
- Figure 5.4 Theresa Street WWTF Aerial Photo (April 2005)
- Figure 5.5 Theresa Street WWTF Aerial Photo (Oct. 12, 2006)
- Figure 5.6 Treatment Facilities SCADA System Diagram
- Figure 5.7 Theresa Street WWTF Historical Influent Flows
- Figure 5.8 Theresa Street WWTF Influent Flow Comparison
- Figure 5.9 Theresa Street WWTF Influent Loading Concentrations
- Figure 5.10 Theresa Street WWTF Influent Mass Loading
- Figure 5.11 Theresa Street WWTF Effluent Concentrations
- Figure 5.12 Northeast WWTF Liquid Process Schematic
- Figure 5.13 Northeast WWTF Hydraulic Profile
- Figure 5.14 Northeast WWTF Biosolids Injection Sites
- Figure 5.15 Northeast WWTF Solids Process Schematic
- Figure 5.16 Northeast WWTF Aerial Photo (April 2005)
- Figure 5.17 Northeast WWTF Aerial Photo (Oct. 12, 2006)
- Figure 5.18 Northeast WWTF Historical Influent Flows
- Figure 5.19 Northeast WWTF Influent Flow Comparison
- Figure 5.20 Northeast WWTF Influent Loading Concentrations
- Figure 5.21 Northeast WWTF Influent Mass Loading
- Figure 5.22 Northeast WWTF Effluent Concentrations
- Figure 5.23 Historical Per Capita Wastewater Flow
- Figure 8.1 Peak Flow Curve Based on Flow Equation
- Figure 8.2 Peak Wastewater Design Flow Equation Comparison
- Figure 8.3 Theresa Street WWTF Ratio of Instantaneous Flow and Peak Wet Weather Flow
- Figure 8.4 Beal Slough Ratio of Instantaneous Flow and Peak Wet Weather Flow
- Figure 10.1 Salt Valley Basin Trunk Sewer System
- Figure 10.2 Locations of Pipes with Velocities <= 2.0 ft/sec - Existing Conditions
- Figure 10.3 Location of Surcharged Pipes - Tier I Conditions
- Figure 10.4 Hydraulic Profile of Surcharged Pipes - Tier I Conditions
- Figure 10.5 Modeled Water Surface Levels With and Without Flow Maximization - Tier I Conditions
- Figure 10.6 Location of Modeled Storage - Tier I Conditions
- Figure 10.7 Comparison of Water Surface Elevations - Tier I Conditions
- Figure 10.8 Comparison of Water Surface Elevation for Various I/I Flow Reduction Target Levels - Tier I Conditions
- Figure 10.9 Locations of Surcharged Pipes - Tier II Conditions
- Figure 10.10 Hydraulic Profile of Surcharged Pipes - Tier II Conditions
- Figure 10.11 Comparison of Water Surface Elevations for Various I/I Flow Reduction Target Levels - Tier II Conditions
- Figure 10.12 Location of Storage with 20% I/I Flow Reduction - Tier II Conditions
- Figure 10.13 Hydraulic Profile - Tier II Conditions with Storage Improvements
- Figure 11.1 Antelope Basin Trunk Sewer System
- Figure 11.2 Location of Surcharged Pipes - Antelope Creek Trunk Sewer - Existing Conditions
- Figure 11.3 Hydraulic Profile of Surcharged Pipes - Antelope Creek Trunk Sewer - Existing Conditions
- Figure 11.4 Locations of Pipes with Velocities <=2.0 ft/sec - Antelope Creek Trunk Sewer - Existing Conditions
- Figure 11.5 Location of Surcharged Pipes - Antelope Creek Trunk Sewer - Tier I Conditions
- Figure 11.6 Hydraulic Profile of Surcharged Pipes - Antelope Creek Trunk Sewer - Tier I Conditions
- Figure 12.1 Beal Slough Trunk Sewer System
- Figure 12.2 Location of Pipes with Velocities <=2.0 ft/sec - Existing Conditions
- Figure 12.3 Location of Surcharged Pipes - Tier I Conditions
- Figure 13.1 Upper Southeast Salt Creek Basin Map
- Figure 13.2 Proposed Tier I and II Sewer Improvements - Upper Southeast Basin
- Figure 14.1 Upper Southwest Basin Map
- Figure 14.2 Proposed Sewer Improvements - Upper Southwest Basin
- Figure 15.1 Haines Branch Basin Map
- Figure 15.2 Proposed Sewer Improvements - Haines Branch Trunk Sewer System
- Figure 16.1 Middle Creek and West 'O' Street Trunk Sewer System
- Figure 16.2 Location of Surcharged Pipes - Existing Conditions
- Figure 16.3 Proposed Sewer Improvements - West 'O' St and Middle Creek Basins
- Figure 17.1 Oak Creek Basin Schematic
- Figure 17.2 Lynn Creek Basin Schematic
- Figure 17.3 Surcharged Pipes - Oak and Lynn Creek Basins - Existing Conditions
- Figure 17.4A Hydraulic Profile Surcharged Pipes - Oak Creek Basin - Existing Conditions
- Figure 17.4B Hydraulic Profile Surcharged Pipes - Oak Creek Basin - Existing Conditions
- Figure 17.5 Hydraulic Profile of Surcharged Pipes- Existing Conditions - Lynn Creek
- Figure 17.6 Proposed Sewer Improvements - Oak Creek Basin
- Figure 18.1 Little Salt Creek Basin Map
- Figure 18.2 Proposed Sewer Improvements - Little Salt Creek Basin
- Figure 18.3 Proposed Sewer Improvements with Storage Alternative - Little Salt Creek Basin
- Figure 19.1 Deadmans Run Trunk Sewer System
- Figure 19.2 East Campus Trunk Sewer System
- Figure 19.3 Havelock Basin Trunk Sewer System
- Figure 19.4 Surcharged Pipes - Existing Conditions - Deadmans Run, East Campus, and Havelock Basins
- Figure 19.5 Hydraulic Profile of Surcharged Pipes - Existing Conditions - Deadmans Run Trunk Sewer
- Figure 19.6 Locations of Pipes with Velocities <= 2.0 ft/sec - Existing Conditions - Deadmans Run, East Campus, and Havelock Basins
- Figure 20.1 Basin Map - Northeast Salt Creek
- Figure 20.2 Hydraulic Profile of Surcharged Pipes -Northeast Basin - Deadmans Run
- Figure 20.3 Proposed Sewer Improvements - Northeast Salt Creek
- Figure 21.1 Stevens Creek Basin Map
- Figure 21.2 Hydraulic Profile - Stevens Creek Trunk Sewer - Existing Conditions
- Figure 21.3 Proposed Sewer Improvements - Stevens Creek Trunk Sewer System
- Figure 22.1 Southeast Basin Map
- Figure 22.2 Proposed Sewer Improvements – Southeast Basin
- Figure 23.1 Planning Area Tier I Improvements
- Figure 23.2 Planning Area Tier II Improvements
- Figure 23.3 Planning Area Tier III Improvements
- Figure 23.4 Planning Area Storage Improvements
- Figure 23.5 Schematic Drawing of Storage Facilities
- Figure 23.6 General Layout of Storage Facilities
- Figure 23.7 Planning Level O&M Costs for Storage Facilities
- Figure 23.8 Modeled Peak Flows at Theresa Street WWTF
- Figure 23.9 Modeled Peak Flows at NE WWTF
- Figure 24.1 Existing WWTF Service Areas
- Figure 24.2 Theresa Street WWTF Projected MMAD Flows
- Figure 24.3 Theresa Street WWTF Aerial Photo with Future Tier I and II Improvements
- Figure 24.4 Proposed Southwest WWTF Service Area - Alternative 1
- Figure 24.5 West Side Salt Creek Trunk Sewer - Alternative 2
- Figure 24.6 Parallel East Side Salt Creek Trunk Sewer - Alternative 3
- Figure 24.7 Increased Storage - Alternative 4
- Figure 24.8 Theresa Street WWTF Tier III Improvements Area
- Figure 24.9 Northeast WWTF Projected MMAD Flows
- Figure 24.10 Northeast WWTF Future Improvements
- Figure 24.11 General Layout of WWTF Facilities
- Figure 25.1 Collection System Projected Maintenance Crew Requirements
- Figure 25.2 Proposed Locations for Flow Monitoring Facilities
- Figure 26.1 Annual Cost of Collection System Improvements
- Figure 26.2 Annual Cost of Theresa Street & Northeast WWTF Improvements
- Figure 26.3 Summary of Annual Improvements