28th & Fair Area Improvements
- Contact Person:
- Kent Evans
- 441-7583
- Type of Project:
- Design and Construction
- Urban Storm Drain Project
- Description:
- The existing storm drainage system is outdated, cannot handle heavy stormwater flows, and experiences street flooding during heavy rain events. The solution is to build a new underground storm drainage system that will route the existing flow to a larger nearby stormwater system that can better handle this amount of stormwater runoff.
- Project Status:
- Construction Complete
- Consultant:
- Olsson Associates
- Contractor:
- Skoda Construction
- Video:
- Download Project Video (1:16)

- Download Project Video (1:16)
- Photos:
- Alley flooding prior to construction:

Between 27th & 28th and Fair & Potter
Between 27th & 28th and Fair & Potter- Flood damage at apartment adjacent to alley:




- Construction:

August 2007
August 2007- Construction Complete:

September 2007- Map of Project:
- Download Project Map (300 K)

- Download Project Map (300 K)
- Public Meetings:
- January 24, 2006:
- Meeting Notice
- Meeting Presentation (458 K)

- November 14, 2006: Meeting Notice