39th & 'D' Area Improvements
- Contact Person:
- Kris Humphrey
- 441-7592
- Type of Project:
- Design
- Urban Storm Drain Project
- Description:
- The design of a new stormwater system near 39th and 'D' Streets. Additional pipes and inlets will be designed in 38th, 39th and 'E' Streets just north of 'D' Street, along with an additional pipe in 'D' Street from 38th to 39th. The result of this new stormwater system will be a reduction in the depth of stormwater flow in the streets and adjacent properties. It will also a reduce the time and extent of flooding near 39th and 'D' Streets.
- Project Status:
- Design Complete
- Consultant:
- The Schemmer Associates
- Contractor:
- BO Bookstrom
- Estimated Construction Start Date:
- Summer 2007
- Estimated Construction Completion Date:
- Fall 2007