2005 Stormwater Bond Issue Projects

4th and Hill Channel Grading


4th & Hill Channel Grading

Contact Person:
Ben Higgins
402-441-7589
Type of Project:
Construction
Stream Channel Stabilization
Description:
The drainage channel banks in this location were eroding in several areas. Some of these areas have buried water, sewer and gas lines that could have become exposed and damaged if the erosion was not fixed. The existing channel had poor drainage due to a low slope which caused standing water in most of the ditch. In 2005 the channel slope was improved and re-seeded to minimize standing water, improve drainage, and reduce the chances of damage from erosion to underground utilities.
Project Status:
Construction Complete
Consultant:
JEO
Contractor:
Garney
Video:
Photos:
Construction Photos at 6th & Hill

June 2005
Construction Complete

May 2005

June 2006
Area after reseeding
Map of Project: