50th & 'R' Area Improvements
- Contact Person:
- Holly Lionberger
- 441-8400
- Type of Project:
- Design and Construction
- Urban Storm Drain Project
- Description:
- The existing storm drain system is undersized and floods at roadway intersections and in low lying locations during heavy rain events. The solution is to build a grass-lined channel at 52nd & 'Q' to accommodate stormwater that the existing pipe can't handle. The box culvert at 50th and 'R' cannot be increased to a size to fully eliminate the flooding without causing flooding to areas downstream. However, underground pipe will be added to the north of 'R' Street to reduce street flooding in that area as much as possible without having an adverse impact to downstream property owners. See fact sheet for more information.
- Project Status:
- Design
- Consultant:
- HDR
- Estimated Construction Start Date:
- Summer 2007
- Estimated Construction Completion Date:
- Fall 2007
- Video:
- Download Project Video (2:04)

- Download Project Video (2:04)
- Photos:
- Flooding Prior to Construction:

August 2002
50th and 'R' Street
August 2002
50th and 'R' Street
August 2002- Map of Project:
- Download Project Map (360 K)

- Download Project Map (360 K)
- Public Meetings:
- April 20, 2006:
- Meeting Notice
- Project Area Maps (1.25 M)

- Project Fact Sheet - October 2006