50th and 'R'


50th & 'R' Area Improvements

Contact Person:
Holly Lionberger
441-8400
Type of Project:
Design and Construction
Urban Storm Drain Project
Description:
The existing storm drain system is undersized and floods at roadway intersections and in low lying locations during heavy rain events. The solution is to build a grass-lined channel at 52nd & 'Q' to accommodate stormwater that the existing pipe can't handle. The box culvert at 50th and 'R' cannot be increased to a size to fully eliminate the flooding without causing flooding to areas downstream. However, underground pipe will be added to the north of 'R' Street to reduce street flooding in that area as much as possible without having an adverse impact to downstream property owners. See fact sheet for more information.
Project Status:
Design
Consultant:
HDR
Estimated Construction Start Date:
Summer 2007
Estimated Construction Completion Date:
Fall 2007
Video:
Photos:
Flooding Prior to Construction:

August 2002
50th and 'R' Street

August 2002
50th and 'R' Street

August 2002
Map of Project:
Public Meetings:
April 20, 2006:
Project Fact Sheet - October 2006