Antelope Creek Tributary in Antelope Park
- Contact Person:
- Rock Krzycki
- 402-441-4959
- Type of Project:
- Construction
- Stream Channel Stabilization
- Description:
- The channel through Antelope Park was experiencing severe stream bank erosion that caused damage to trees, trails, a pedestrian bridge, and threatened to damage streets close to the channel bank. This project will reduce the erosion problems and remove the threat of damage to amenities in the park by adding a winding stream and placing large rocks along certain sections of the channel to slow the water.
- Project Status:
- Construction Complete
- Consultant:
- The Flatwater Group
- Contractor:
- Nemaha Landscape Construction
- Video:
- Download Project Video (2:23)

- Download Project Video (2:23)
- Photos:
- Prior to Construction:

October 2002
Memorial Dr. N of South Street (Antelope Park) - excessive stream bank erosion
November 2005
Memorial Dr. just south of Garfield Street (Antelope Park) - excessive stream bank erosion- Construction:

March 2006
Sanitary sewer crossing near Van Dorn St.


Sediment and Erosion Control Matting
Sediment and Erosion Control Matting with Vegetation- Before

June 2006
Memorial Dr. just south of Garfield St. - After

August 2006
Memorial Dr. just south of Garfield St. - MSE wall is installed 
- Vegetated "No Mow" Stream Banks:

June 2007
June 2007
June 2007- Map of Project:
- Download Project Map (330 K)

- Download Project Map (330 K)
- Public Meetings:
- November 4, 2004
- July 19, 2005: Meeting Notice (64 K)

- August 26, 2005 (neighborhood meeting)
- The Flatwater Group Project Spotlight — Antelope Creek Tributary (594 K)

- CADD Concept Rendering

- Lincoln Journal Star Article: "Creek in Antelope Park gets facelift", 3/19/06

- Rain to Recreation