Deadmans Run Channel Rehabilitation

- Contact Person:
- Devin Biesecker
- 402-441-4955
- Type of Project:
- Design and Construction
- Stream Channel Stabilization
- Description:
- Re-alignment and stabilization of a degraded tributary to Deadmans Run, and some stabilization along Deadmans Run main stem.
- Project Status:
- Construction Complete
- Consultant:
- The Schemmer Associates
- Contractor:
- Land Construction
- Video:
- Download Project Video (2:40)

- Download Project Video (2:40)
- Photos:
- Interactive Image Map:

Zoom in on areas of this aerial photo- Prior to Construction:

Deadmans Run Creek, north of Holdrege - excessive erosion



- Construction:


Drop structure
Rock check dam
Low flow structure- Before & After Photos:
- Before

Hold box before - After

Hold box after - Map of Project:
- Download Project Map (340 K)

- Download Project Map (340 K)