Brentwood Estates
- Contact Person:
- Erika Nunes
- 441-5675
- Type of Project:
- Design and Construction
- Urban Storm Drain Project
- Description:
- Replace two concrete liners with storm drain pipe, and convert a manhole to a grate inlet.
- Project Status:
- Construction
- Consultant:
- Kirkham Michael
- Construction Start Date:
- Spring 2007
- Estimated Construction Completion Date:
- Summer 2007
- Contractor:
- K2 Construction
- Map of Project:
- Download Project Map (329 K)