Main Menu Skip to Content
InterLinc Home Page
lincoln.ne.gov
City of Lincoln
Virtual Tour Projects- Watershed Master Plan Implementation Projects

Beal Slough at 40th and Highway 2


Beal Slough at 40th & Highway 2

Lower Platte South Natural Resources District
Contact Person:
Devin Biesecker
441-4955
Type of Project:
Preliminary Design
Flood Management
Description:
The project will reduce flooding along this branch of Beal Slough at S 40th St. and Highway 2. The project would add a new box culvert under Highway 2 to reduce flooding to properties along to Beal Slough.
Project Status:
Conceptual Design
Consultant:
Olsson Associates
Estimated Start Date:
Design and construction are dependent on future funding.
Contractor:
To Be Determined
Video:
Photos:

Flood water upstream of 40th St.
Map of Project:
Validate

Virtual Tour Projects - Watershed Master Plan Implementation Projects