Stevens Creek Stream Stability North of 84th & Fletcher

- Contact Person:
- Devin Biesecker
- 402-441-4955
- Type of Project:
- Construction
- Stream Channel Stabilization
- Project Description:
- This project will be designed and built in conjunction with a new box culvert under Fletcher Ave. This project will stabilize a portion of the tributary and prevent erosion from moving upstream. If the erosion is allowed to continue and move upstream it could pose a threat to public infrastructure and private property.
- Project Status:
- Construction Complete
- Consultant:
- Olsson Associates
- Contractor:
- Dobson Brothers
- Photos:

- Map of Project:
- Download Project Map (214 K)