Southeast Upper Salt Creek Stream Stability

- Contact Person:
- Devin Biesecker
- 402-441-4955
- Type of Project:
- Design
- Stream Channel Stabilization
- Project Description:
- The design of stream stabilization along a portion of the tributary between 27th and 40th Streets, north of Rokeby Road. This stream reach was identified as a area of concern in the Southeast Upper Salt Creek Watershed Stormwater Master Plan. Development in this watershed will be occurring rapidly in the upcoming years. Urbanization of the watershed will increase erosion along the stream and, if allowed to continue, could pose a threat to public infrastructure and private property.
- Project Status:
- Construction Complete
- Consultant:
- The Flatwater Group
- Contractor:
- Land Construction
- Map of Project:
- Download Project Map (194 K)

- Download Project Map (194 K)
- Southeast Upper Salt Creek Watershed Stormwater Master Plan