Main Menu Skip to Content
InterLinc Home Page
lincoln.ne.gov
City of Lincoln
2007 Stormwater Bond Issue

General Projects and Estimates


Lincoln Stormwater Bond Issue Projects for May 2007 Stormwater Bond Issue

Projects and cost estimates as of 3/9/2007

Urban Storm Drain Area Improvement Projects
39th and D Street Area ImprovementsDesign and Construction$500,000
48th, Holdrege to Y Area ImprovementsDesign and Construction$490,000
29th and Center Area ImprovementsDesign and Construction$200,000
51st and Hillside Area ImprovementsDesign and Construction$150,000
Ginny and Gertie Area ImprovementsConstruction$1,100,000
52nd and South Area ImprovementsDesign and Construction$400,000
21st, P to N Area ImprovementsConstruction$200,000
O, 21st to 23rd Area ImprovementsConstruction$120,000
2nd, N to O Area ImprovementsConstruction$70,000
6th and Old Cheney Area Flood Control ProjectConstruction$700,000
Miscellaneous Repairs and RehabilitationsDesign and Construction$250,000
Preliminary Engineering and Prioritization for Urban Drainage SystemsPreliminary Engineering$200,000
 $4,380,000
Preliminary Engineering and Projects for Master Planned Basins
Preliminary Engineering for Watershed Master PlansPreliminary Engineering$300,000
Riparian Restorations for Easement AreasDesign and Construction$40,000
14th and HWY 2, Beal Slough Flood Control ProjectDesign and Construction$865,000
40th and HWY 2, Beal Slough Flood Control ProjectConcept and Design$100,000
27th to Southwood, Beal Slough Stream StabilityConstruction$300,000
Tierra/Briarhurst Park Beal Slough Water Quality ProjectsDesign and Construction$130,000
Upper Beal Slough Flood Detention ProjectsROW and Construction$410,000
98th and Adams, Stevens Creek Stream StabilityConstruction$475,000
98th and Van Dorn, Stevens Creek Tributary Stream StabilityConstruction$200,000
Cardwell Branch and Dead Man's Run Project DesignDesign$125,000
 $2,945,000
Water Quality Best Management Practice Projects
BMP Demonstration ProjectsDesign and Construction$125,000
 $125,000
Floodplain/Floodprone Area Engineering and Projects
Easement/acquisitions for floodplain/ floodprone areasROW$150,000
Lynn Creek Flood ControlConstruction$100,000
Salt Creek Flood ControlPreliminary Engineering/ROW$200,000
 $450,000
Stream Rehabilitation on Parks Properties
Taylor ParkConstruction$400,000
 $400,000
TOTALS$8,300,000

Projects for Master Planned Basins are based on approved watershed master plans. This list of project locations represent the City's best effort to identify those projects anticipated to be completed based on a priority system, however as implementation proceeds, individual projects implemented within the scope of the master plans may change based on cost-shares, public-private partnerships, and feasibility after design is complete.