Lincoln Stormwater Bond Issue Projects for May 2007 Stormwater Bond Issue
Projects and cost estimates as of 3/9/2007
| Urban Storm Drain Area Improvement Projects | ||
|---|---|---|
| 39th and D Street Area Improvements | Design and Construction | $500,000 |
| 48th, Holdrege to Y Area Improvements | Design and Construction | $490,000 |
| 29th and Center Area Improvements | Design and Construction | $200,000 |
| 51st and Hillside Area Improvements | Design and Construction | $150,000 |
| Ginny and Gertie Area Improvements | Construction | $1,100,000 |
| 52nd and South Area Improvements | Design and Construction | $400,000 |
| 21st, P to N Area Improvements | Construction | $200,000 |
| O, 21st to 23rd Area Improvements | Construction | $120,000 |
| 2nd, N to O Area Improvements | Construction | $70,000 |
| 6th and Old Cheney Area Flood Control Project | Construction | $700,000 |
| Miscellaneous Repairs and Rehabilitations | Design and Construction | $250,000 |
| Preliminary Engineering and Prioritization for Urban Drainage Systems | Preliminary Engineering | $200,000 |
| $4,380,000 | ||
| Preliminary Engineering and Projects for Master Planned Basins | ||
| Preliminary Engineering for Watershed Master Plans | Preliminary Engineering | $300,000 |
| Riparian Restorations for Easement Areas | Design and Construction | $40,000 |
| 14th and HWY 2, Beal Slough Flood Control Project | Design and Construction | $865,000 |
| 40th and HWY 2, Beal Slough Flood Control Project | Concept and Design | $100,000 |
| 27th to Southwood, Beal Slough Stream Stability | Construction | $300,000 |
| Tierra/Briarhurst Park Beal Slough Water Quality Projects | Design and Construction | $130,000 |
| Upper Beal Slough Flood Detention Projects | ROW and Construction | $410,000 |
| 98th and Adams, Stevens Creek Stream Stability | Construction | $475,000 |
| 98th and Van Dorn, Stevens Creek Tributary Stream Stability | Construction | $200,000 |
| Cardwell Branch and Dead Man's Run Project Design | Design | $125,000 |
| $2,945,000 | ||
| Water Quality Best Management Practice Projects | ||
| BMP Demonstration Projects | Design and Construction | $125,000 |
| $125,000 | ||
| Floodplain/Floodprone Area Engineering and Projects | ||
| Easement/acquisitions for floodplain/ floodprone areas | ROW | $150,000 |
| Lynn Creek Flood Control | Construction | $100,000 |
| Salt Creek Flood Control | Preliminary Engineering/ROW | $200,000 |
| $450,000 | ||
| Stream Rehabilitation on Parks Properties | ||
| Taylor Park | Construction | $400,000 |
| $400,000 | ||
| TOTALS | $8,300,000 | |
Projects for Master Planned Basins are based on approved watershed master plans. This list of project locations represent the City's best effort to identify those projects anticipated to be completed based on a priority system, however as implementation proceeds, individual projects implemented within the scope of the master plans may change based on cost-shares, public-private partnerships, and feasibility after design is complete.