'O' from 21st to 23rd Area Improvements
- Contact Person:
- Ben Higgins
- 441-7589
- Type of Project:
- Design and Construction
- Urban Storm Drain Project
- Description:
- Two block project for new storm drainage pipe project in 'O' Street, from 21st to 23rd. This project provides for the construction of a new underground drainage system to connect the adjacent existing drainage system to the Antelope Valley improvements.
- Project Status:
- Construction Complete
- Consultant:
- Parsons Brinckerhoff/Olsson Associates
- Contractor:
- United Construction
- Map of Project:
- Download Project Map (192 K)