2007 Stormwater Bond Issue

2nd and 'O'


2nd from 'N' to 'O' Area Improvements
(in conjunction with the Harris Overpass Bridge Project)

Contact Person:
Kris Humphrey
402-326-1176
Type of Project:
Design and Construction
Urban Storm Drain Project
Description:
The existing stormwater trunk main along 2nd Street between 'N' and 'O' streets does not have enough capacity to accommodate the appropriate design-year storm. As a result, a secondary main was constructed along 2nd Street between 'N' and 'O' streets.
Project Status:
Construction Complete
Consultant:
The Schemmer Associates
Contractor:
Cramer & Associates
Map of Project:
Public Meetings:
October 30, 2007 - Harris Overpass Pre-Construction Open House InterLinc Site
December 5, 2006 - Harris Overpass Final Design Open House InterLinc Site