Beal Slough Flood Protection at 40th and Hwy. 2
- Contact Person:
- Devin Biesecker
- 441-4955
- Type of Project:
- Concept
- Flood Reduction Project
- Description:
- The project was for reducing flooding along Beal Slough in the vicinity of 40th Street and Highway 2. Through the concept study it was found that the benefit/cost ratio for the project warranted putting the project on hold and not proceeding at the present time. This was a joint project by the Lower Platte South NRD and the City.
- Project Status:
- On Hold Indefinitely
- Consultant:
- Olsson Associates