Stormwater Demonstration Projects
- Contact Person:
- Ben Higgins
- 441-7589
- Type of Project:
- Design and Construction
- Best Management Practice
- Description:
- In March of 2005, the City adopted the Stevens Creek Watershed Master Plan, which included recommendations for City-wide stormwater standards that integrate water quality features with flood control facilities on new development sites in order to protect water quality and prevent stream erosion. These features, called "Site-Specific Structural Best Management Practices," were recommended to be implemented through a public-private cost share approach. This recommendation was based on the assumption that there is both a private and public responsibility relative to how these features function together as a system to address water quality and stream stability throughout a watershed.
- Current projects funded for demonstration projects include rain gardens and bioswales for a new elementary school at Arnold Heights. This is a joint project with Public Works, Lincoln Public Schools and the Lower Platte South NRD.
- The wetland rehabilitation project upstream of Holmes Lake is a joint project with Public Works, the Parks Department and the State Game and Parks Department.
- Project Status:
- Complete
- Consultant:
- Olsson Associates – (Arnold Heights project)
- The Flatwater Group – (Holmes Lake Watershed Project)
- Map of Project:
- Download Project Map (200 K)

- Download Project Map (200 K)
- Stevens Creek Watershed Master Plan