Taylor Park Water Quality and Stream Stability


Taylor Park Water Quality and Stream Stability

Parks and Recreation Dept.
Contact Person:
Rock Krzycki
402-309-5936
Type of Project:
Design and Construction
Best Management Practice
Description:
The goal of this project is to reduce erosion issues, improve water quality and reduce street flooding (Mesaverde Drive south of Taylor Park). This was done by stabilizing the channel banks, constructing small grade control structures, creating a water quality cell near the south end of the park and constructing an stormwater overflow route from Mesaverde Drive to the channel. This project was being led by Public Works in coordination with the Parks Dept.
Project Status:
Construction Complete
Consultant:
The Flatwater Group
Contractor:
Nemaha Landscaping
Photos:
Bank Erosion Prior to Construction:
Construction:

April 2008
Native Vegetation:

July 2009

July 2009
Map of Project:
Public Meetings:
April 25, 2006
May 15, 2006
November 20, 2007