Main Menu Skip to Content
InterLinc Home Page
lincoln.ne.gov
City of Lincoln
Watershed Management Projects

Tyrrell Park Stream Improvements


Tyrrell Park Stream Stability & Water Quality Project

Project Summary

The City of Lincoln Public Works and Utilities Watershed Department and the City of Lincoln Parks and Recreation Department have completed improvements to Tyrrell Park. The project will improve stormwater quality, reduce stormwater flow velocities, reduce potential flooding threats to adjacent properties, and provide environmental education opportunities for Mickle Middle School and the general public. The project area includes the west side of Tyrrell Park, directly north of Mickle Middle School.

The design includes several features to improve stormwater quality. Stormwater management practices include a grass channel, infiltration basins that detain and infiltrate stormwater, permeable pavers in the north parking lot, pervious pavement in the south parking lot, and various native plantings. A device called a hydrodynamic separator has been installed, which will remove sediment and trash from street runoff before it flows into the park. The project also includes a new walking trail through the park with educational exhibits that feature native plantings, infiltration basins, examples of different regional stone, and educational signs.

Public Involvement

Open House - Thursday, April 26, 2012
5:00 to 7:00 p.m.
Mickle Middle School cafeteria (enter through the main west door)
2500 N. 67th Street
Open House Invitation (116 K) PDF Document

For more information contact:

Robb Lutz
EA Engineering, Science, and Technology
402.476.3766
Ed Kouma
Lincoln Public Works and Utilities Watershed Management
402.441.7018
Validate

2010 Stormwater Bond Issue