Contractors must have current registration and insurance on file to pull permits.
Contractors must have an active Master Contractor license with the City of Lincoln prior to applying for a permit
All code requirements for electrical permits are available in Chapter 23.10 ELECTRICAL CODE
The process to apply for a permit takes about 10 minutes.
You will need to create an account at Citizen Access as a contractor.
A walkthrough guide is available under the Citizen Access Information page
Are you needing the legal address? Use the County Assessor's Site.
Is your project in a commercial building or shared property space? Use the GIS Map.
Applicants can apply in person at the City Building or online.
Paper applications(PDF, 639KB) can be mailed in with a check to:
City of Lincoln Attn: Building and Safety Department 555 S 10th St, Room 203 Lincoln, NE 68508
You can pay online through Citizen Access
You’re able to use a Visa, Mastercard, American Express, or Discover.
All permits will have a minimum $35 fee. Additional fees may apply.
Once the permit has been issued it needs to be inspected. A rough in inspection is called for when there is wiring/conduit that is done that will be concealed by building finish. A final inspection is called for when all the electrical work has been done, a service inspection is requested when the service installation is complete.
You can schedule an inspection through Citizen Access or calling the 24 -hour inspection line at 402-441-5999.
Please have your permit number, date for inspection, and access instructions if necessary.
Non-compliance with the codes may result in a reinspection fee.