14th and Old Cheney A transportation project in Lincoln, NE transforming 14th Street, Old Cheney Road, and Warlick Boulevard into an elevated roundabout and T-intersection.
27th Street Adaptive Signal Project The proposed North 27th Street, “O” Street to I-80 project would involve upgrading existing traffic signals and communication infrastructure along and adjacent to North 27th Street in the City of Lincoln, Nebraska in Lancaster County.
33rd and Cornhusker The purpose of the project is to identify and evaluate potential transportation improvements in the north portion of Lincoln, with specific attention along the rail corridor between N. 27th and N. 48th streets. The project is currently in the Planning phase.
40th Street from Yankee Hill Road to Rokeby Road This project will pave South 40th Street from Yankee Hill Road to Rokeby Road. There are two roundabout intersections planned at Prairie Wind Rd. and Rokeby Road. The intersection at Hohensee Dr. will be stop-controlled or signalized, depending on which is warranted.
56th Street from Spruce Street to Van Dorn Street This proposed project would rehabilitate the pavement along 56th St. from Spruce St. to Van Dorn St. to improve roadway conditions as necessitated by the current pavement age and condition.
84th Street and College Park Drive This project would replace traffic signal poles and related infrastructure at the intersection of 84th & College Park Dr. Curb ramps would be reconstructed to meet current standards.
Adams Street from 36th Street to 49th Street The purpose of this project is to preserve and extend the service life of existing facilities and enhance safety by using safety conscious design.
East Beltway The East Beltway will constitute the east leg of a circumferential freeway system around Lincoln that will be made up of Interstate 80 to the north, the Homestead Expressway (Hwy 77) to the west, and the South Beltway to the south.
Randolph Street from Capitol Parkway to 40th Street This project would rehabilitate approximately 1.25 miles of Randolph Street between Capitol Parkway and 40th Street.
Salt Creek Floodplain Resiliency Study The goal of this project is to reduce adverse impacts from flooding to life and property from existing and future flood events.
US Hwy 6 from West “O” to Cornhusker (NDOT) This project is studying how to provide an efficient roadway, improve traffic operations, resolve existing roadway deficiencies, and accommodate locally adopted plans for US 6 between West 'O' Street and Cornhusker Highway.
West Beltway (NDOT) The project involves upgrading existing US-77 to freeway standards from Saltillo Road to south of Van Dorn Street.
West “A” from West City Limits to SW 23rd This project is part of a multi-phased effort to improve the West “A” Street corridor from the West City Limits to the intersection of SW 5th Street.
“A” Street from 40th Street to 56th Street This project would rehabilitate approximately one mile of “A” Street between 40th and 56th streets.