17th from “A” to “S” - Street Improvement Project

Project Summary

Lincoln on the Move is investing in improvements to approximately 1.3 miles of 17th Street from “A” Street to “S” Street. These improvements may include a mill and overlay of the existing surface and base repairs where required, joint and crack sealing, public utility adjustments, pavement markings and inlet top replacements. Additional work with other funding sources may include upgrades to the existing curb ramps to comply with the Federal Americans with Disabilities Act (ADA) requirements.

The south project limits are to be coordinated with the street improvement project on “A” Street from 6th to 17th streets. North project limits are to be coordinated with UNL.

Project Location

Funding

Schedule

Construction is tentatively planned for 2025.

Access During Construction

The project will require lane closures during construction on 17th Street. Sidewalk closures will be necessary while curb ramps are being replaced.