Normal from 33rd to 70th - Street Improvements

Project Summary

Lincoln on the Move is investing in improvements to approximately three miles of Normal Boulevard from 33rd to 70th streets. These improvements will include mill and overlay with concrete and base repairs or replacement where required, curb and median repair or replacement, joint and crack sealing, inlet and inlet top replacements, and public utility adjustments. Additional work with other funding sources includes traffic signal replacement at South Street, 40th Street, 48th Street, and 56th Street, and pedestrian ramp reconstruction to meet federal and local standards.

Project Location

Funding Details

A majority of this project is being funded by the Lincoln on the Move program.

Schedule

Construction is tentatively planned for 2025.