This project includes replacing the traffic signal on Calvert and 48th streets, and installation of a roundabout at Calvert and 56th streets. Sidewalk ramps will also be reconstructed at these intersections as part of the project.
Project Funding
Schedule
The project is currently in design. Construction is tentatively planned for 2027.
Access During Construction
Street and sidewalk closures will be necessary during construction.