This project will repair selected sections of sidewalk in the area of 27th and 40th streets from Old Cheney Road to Nebraska Parkway. The project includes 68 locations of sidewalk repair and ADA ramp reconstruction.
Project Area
Individual repair locations will be within the general project area.
Funding
Schedule
Construction will occur in 2024.
Access During Construction
Due to the nature of work, there may be times areas are closed to pedestrians.