2019 Residential Rehabilitation - West “A” Neighborhood

Scope of Work

This project will mill and overlay the streets with new asphalt. Pedestrian curb ramps that do not meet current Federal and local standards will be reconstructed to meet those standards.

Access During Construction

The Contactor will be allowed a total closure of the residential street; however, local access to homes will be maintained whenever possible. Access for emergency vehicles and to businesses will be maintained at all times.

Locations

Re-center mapFull-screen

  • SW 23th from W Sumner to W South
  • SW 24th from W “A” to SW 23rd
  • W Peach Court
  • SW 16th from S South to W “A”
  • W Rose from SW 17th to SW 15th
  • SW 15th from W Rose to W “A”
  • Tony Circle
  • Westmont Circle
  • SW 9th from W Rose to W “A”
  • SW 8th from W Rose to W “A”

Project Contacts

  • Construction Project Manager

    Cody Wilbers
    Benesch
    Phone: 402-310-9268
    Email: cwilbers@benesch.com

  • Project Engineer

    Marc Rosso
    City of Lincoln, LTU Project Delivery
    Phone: 531-207-3244
    Email: mrosso@lincoln.ne.gov