The City has been divided into seven districts or benefit areas, and each has a separate account. Fees collected in a district or benefit area may be used only for new construction in that area. Districts apply to arterial streets, water distribution, wastewater and parks and trails.

Benefit Area Maps
Water Distribution (280 K)
Neighborhood Parks & Trails (359 K)
Arterial Street (185 K)
Collections and Expenditures Report
This report has collection totals, expenditures and the remaining balance for each district. Last updated 8/31/13
Parks & Trails Investments

The Parks & Trails impact fee can pay for: site grading and drainage, landscaping, sidewalks, play courts, basketball goals and poles, pre-fabricated shelter structures, picnic shelter pads and tables, trash receptacles, modular play structures, benches, play area matting, sand and labor.

Impact fee dollars for Parks & Trails have been invested in these areas:

As of 8/31/13

District 1 Design, site grading and park/playground development at Ashley Heights Park 133,270
District 1 Park Improvements at Salt Creek Levee Trail 7,197
District 2 Hydrologic evaluation and site design services for the future Hartland's Garden Valley Park 96,511
District 2 New picnic shelter for Stonebridge Park 17,122
District 2 Design services for the future trail underpass at Alvo Road Trail 3,267
District 2 Property Acquistion for Fallbrook Park 225,402
District 2 Design services for future trail at Landmark Fletcher Trail site 32,840
District 3 New picnic shelter for Schleich Park 10,770
District 4 Property Acquisition for Waterford Park 163,964
District 5 Pipe railings and deflector boards for the Billy Wolff Trail extension 33,643
District 5 Installation of new playground and picnic shelter for Phares Park 67,551
District 5 Park improvements at Mendoza Park 2,758
District 5 Additional property acquisition for Eden Park South 109,087
District 6 Design and preliminary grading for the Cavett Trail connector 26,638
District 6 Sidewalk connections in Country View Park 57,989
District 6 Design services for Cavett Connector 16,090
District 6 Sidewalk Construction at Grand Terrace Park 33,701
District 7 Property acquisition for the future Folsom Park site 174,213
District 7 Sidewalk connections in Densmore Park 3,922
Total $1,215,935
Arterial Streets Investments

The Arterial Streets impact fee can pay for: pavement, bike trails, median landscaping, street lights, storm sewer, box culverts, retaining walls.

Impact fee dollars for Arterial Streets have been invested in these areas.

As of 8/31/13

District 1 Design and construction of 2 Lanes Offset NW 56th from Partridge to Adams 1,010,232
District 1 Design of current and future conditions for Coddington from West "A" to West Van Dorn 2,400,746
District 1 Design of 4 through lanes at West "A" / SW 40th and Coddington 359,043
District 1 Traffic Signal and turn lane construction at NW 48th and Huntington 118,660
District 1 Design of 4 through lanes at NW 48th, West "O" to W Adams 187,526
District 2 Design and construction of 4 through lanes at 14th / Superior / Alvo Rd 2,254,578
District 2 Design and construction of 2 lane offset at Fletcher / 14th / Telluride 633,721
District 3 Construction of additional turn lane at N 56th and Cornhusker Hwy 315,000
District 3 Design of 4 through lanes at Arbor from 40th to 56th 76,643
District 3 Design of 4 through lanes at Arbor from 56th to 70th & 70th from Arbor to Salt Creek 51,555
District 3 Study and capacity needs 70th and Cornhusker to 84th and Cornhusker Areas 1,788
District 4 Design of 2 + 1 lane section on Adams from 75th to 90th and turn lane improvements on 84th at Windmill 1,958,241
District 4 Design and construction of additional turn lane and traffic signal at 84th & Havelock 303,761
District 4 Design and construction of traffic signal at 84th and Leighton 224,536
District 5 Design and construction of additional lanes on Pine Lake Road from 84th to 98th 999,314
District 5 Design and construction of three lane section of 98th street from Pine Lake Road to Old Cheney 2,943,300
District 5 Design and construction of additional turn lane and traffic signal at 56th and Elk Crest 271,081
District 5 Design and construction of two lanes with turn lanes on 98th from Pine Lake to Yankee Hill 509,355
District 6 Design of 4 through lanes on 56th Pine Lake to Yankee Hill 265,932
District 6 Design of 4 through lanes on Pine Lake from 56th to Hwy 2 452,885
District 6 Construction of 4 lanes on Pine Lake Road from 40th to 56th 1,100,556
District 6 Installation of new traffic signal at 40th & Yankee Hill 122,067
District 6 Construction of 4 lanes on 27th South of Yankee Hill 171,638
District 6 Design of 4 through lanes at S 40th, Yankee Hill-Rokeby 172,386
District 6 Design of 4 through lanes on S. 56th from Old Cheney to Pine Lake Road 191,975
District 6 Design of 4 through lanes on S. 56th from Shadow Pines to Old Cheney 205,702
District 7 Design on intersection improvements at 14th/Old Cheney/Warlick 1,342,142
District 7 Design and construction of turn lanes on Pine Lake Road between 14th and 27th 428,750
District 7 Design of 4 through lanes at 27th from Pine Lake to Yankee Hill 1,330,612
Total $20,403,725
Water & Wastewater Investments

The Water & Wastewater impact fee can pay for: water supply, treatment, transmission mains, pumping and storage reservoirs, water lines 16 inches and larger, wastewater lines 10 inches and larger.

Impact fee dollars for Water and Wastewater have been invested in these areas.

Water System

As of 8/31/13

  Pump Modifications at NE Pump Station 1,020,000
  Transmission main Greenwood to Lincoln 4,114,746
Total   $5,134,746

Water Distribution

As of 8/31/13

District 1 Water main at NW 25th to 27th Street at Hwy. 34 267,354
District 1 Water main at W Adams, NW 48th - 63rd, NW 56th South 199,778
District 1 Water main at Holdrege, NW 40th - 48th 31,383
District 1 Water main at West "O" St., NW 56th - West 126,908
District 2 Water main at NW 12th to 27th Street at Hwy. 34 195,952
District 2 Water main at NW 12th, US 34 to Fletcher 32,272
District 2 Water mains at NW 12th to Fletcher at Hwy. 34 100,000
District 2 Water mains at NW 12th Loop 2,071
District 2 Water main at Fletcher from 14th to 17th 210,359
District 2 Water main at 14th, Julesburg to Alvo 120,858
District 3 Water main at N 56th, Fletcher to Arbor Rd 34,199
District 3 Water main at Arbor Road, from 52nd to 56th 37,847
District 3 Water main at Arbor Road, from 56th to 70th 6,557
District 4 Water main at Adams, 81st to 87th 202,418
District 4 Water main at Waterford Estates 120,208
District 4 Water main at Holdrege, 88th to 98th 3,063
District 4 Water main at 98th, Holdrege to "O" Street 33,096
District 4 Water main at Adams, 91st to 98th & Leighton 75,070
District 5 Water main at 98th Pine Lake Rd to Yankee Hill 640,818
District 5 Water main at Pioneers, 87th to Thorns 15,330
District 6 Water main at 27th to 56th Yankee Hill to Union 267,829
District 6 Water main at Rokeby, 27th to 40th 54,310
District 6 Water main at 70th/Pine Lake/Yankee Hill 75,752
District 6 Water main at Yankee Hill, from 56th to 84th 324,551
District 7 Water main at W Van Dorn, Coddington East 3,084
District 7 Water main at Folsom/Pioneers/Old Cheney 362,801
Total   $3,543,868

Wastewater

As of 8/31/13

  48" Upper SE Trunk Sewer Main at Salt Valley Basin 287,684
  36" Relief Trunk Sewer Main at Beal Slough Basin 1,350,000
  30" West "O" Trunk Sewer Extension 310,000
  66" Trunk Sewer Main at Steven's Creek Bas 2,141,609
  36" NE Salt Creek Basin 70,000
Total   $4,159,293