Main Menu Skip to Content
InterLinc Home Page
lincoln.ne.gov
City of Lincoln
Construction Activity Erosion and Sediment Control Requirements

NOI/SWPPP for Individual Lots


NOI/SWPPP for Individual Lots

For Construction Activity on individual lots that are part of a larger common plan of development or sale, applicants for building permits must:

  1. Provide the Construction Stormwater Permit number for the development if the building phase of development for individual lots is covered under one Stormwater Pollution Prevention Plan (SWPPP) that is submitted by and under the control of the developer.

    OR
  2. Submit two copies of a Notice of Intent (NOI) and SWPPP, including a site plan, for the individual lot on the form provided by the City. Submission of this form supercedes any prior NOI and SWPPP for the lot indicated in the application and the applicant assumes sole responsibility for the building phase of development for this lot.

All documents in Acrobat (PDF) format. Acrobat Document

Validate

Construction Activity Erosion and Sediment Control Requirements