27th from Nebraska Parkway to South - Street Improvements

27th from Nebraska Parkway to South Street Public Information Open House

February 12, 2026 5:30 - 7:30 p.m. Irving Middle School Cafeteria 2745 South 22nd Street

Lincoln on the Move is investing in improvements to approximately 1.5 miles of 27th Street from Nebraska Parkway to South Street. These improvements include concrete repair or replacement, joint and crack sealing, mill and overlay, curb and median repair or replacement, public utility adjustments, pavement markings and inlet top replacements. Additional work with other funding sources includes signal replacements at Woods Boulevard, Sheridan Boulevard, and Van Dorn Street; pedestrian crossing with rectangular rapid flashing beacons (RRFBs) at Stockwell Street/O’Reilly Drive; upgrades to the existing curb ramps to comply with Americans with Disabilities Act (ADA) requirements; and water main repairs and lead service line replacements.

Project Location

Right-of-Way

No property or right-of-way acquisitions are anticipated for this project. All work would occur in the existing right-of-way and there are no anticipated impacts to recreation resources such as the Country Club of Lincoln or any historic properties. As part of construction, there may be a need for temporary access to properties for surveying, access to utilities, and equipment access. Any access that is needed will be communicated ahead of time to the property owner and/or resident.

Project Funding

This project is programmed as a part of the commitment to voters to invest significant sales tax funds into improvement of existing streets. The project will be funded jointly from the Highway Allocation Funds (aka-Gas Tax) and ¼ cent sales tax for streets in accordance with ballot language.

Schedule

Street construction is expected to take place in 2026. Signal replacements will be completed in summer of 2027.

Access During Construction

Improvements would be completed under temporary street closures. Closures would be phased to reduce access impacts for homes and businesses. Access may be limited at times during construction. The contractor will contact residents that may have access impacts prior to the start of construction.

Community Engagement

Public Information Open House
February 12, 2026
5:30 - 7:30 p.m.
Irving Middle School Cafeteria, 2745 South 22nd Street

Project Contacts

  • David Tull, Design Engineer
    City of Lincoln Transportation and Utilities
    dtull@lincoln.ne.gov
    402-890-9658