This project will replace water mains along the following streets:
Construction is anticipated to take place in 2028.
Area property owners, pedestrians, and drivers would experience phased road closures for thru traffic to accommodate the proposed improvements during construction. Local access would be maintained to the extent possible using side streets, alleyways, and sidewalks.
David Tull, Design Engineer City of Lincoln, Transportation and Utilities dtull@lincoln.ne.gov 402-441-7711
Andy Walker, Superintendent of Water Distribution Lincoln Water System awalker@lincoln.ne.gov 402-890-7955