This project will replace water mains along the following streets:
Construction is anticipated to take place in 2028.
Craig Aldridge, Design Engineer City of Lincoln, Transportation and Utilities caldridge@lincoln.ne.gov 402-416-5349
Andy Walker, Superintendent of Water Distribution Lincoln Water System awalker@lincoln.ne.gov 402-890-7955