This project will replace water mains in the area of 27th Street from Fairfield to Superior streets. Construction will take place in the following areas:
Construction is scheduled to take place in 2027.
Construction will be done under lane closures.
Craig Aldridge, Design Engineer City of Lincoln, Transportation and Utilities caldridge@lincoln.ne.gov 402-416-5349
Andy Walker, Superintendent of Water Distribution Lincoln Water System awalker@lincoln.ne.gov 402-890-7955