This project will extend the water distribution main along S 40th Street from Saltillo Road to Tiger Lily Road.
Construction is anticipated to begin in 2027.
David Tull, Design Engineer City of Lincoln, Transportation and Utilities dtull@lincoln.ne.gov 402-441-7711
Raitis Tigeris, Project Manager Lincoln Water System rtigeris@lincoln.ne.gov 402-525-3285