Visitors are encouraged to review updated parking options due to construction.
This project will replace water mains along the following streets:
Sidewalks, curb ramps, driveways, and street pavement will be removed and replaced as needed for the water main construction.
Construction is expected to take place in 2027.
The project may require street closures during construction.
Curb ramps and sidewalks may be impacted by construction. One direction of sidewalk should be available at all times throughout neighborhood.
Ryan Leeper, Design Engineer City of Lincoln, Transportation and Utilities rleeper@lincoln.ne.gov 402-890-3126