S Folsom and W “C” Street Area - Water Main Replacement Project

Project Summary

This project includes water main replacements along the following streets:

  • South Folsom Street from West "A" to West "D" streets
  • SW 6th Street from West "A" to West "E" streets
  • West "B" Street from South Folsom to SW 6th streets
  • West "C" Street from South Folsom to SW 6th streets

Project Location

Project Funding

Schedule

Construction is anticipated to take place in 2028.

Access During Construction

Area property owners, pedestrians, and drivers may experience phased road closures for thru traffic to accommodate the proposed improvements during construction. Local access would be maintained to the extent possible using side streets, alleyways, and sidewalks.

Project Contacts

  • David Tull, Design Engineer
    City of Lincoln, Transportation and Utilities
    dtull@lincoln.ne.gov
    402-441-7711

  • Andy Walker, Superintendent of Water Distribution
    Lincoln Water System
    awalker@lincoln.ne.gov
    402-890-7955